StarlynnCare

The Gardens at Town Square: inspection reports

The DSHS record for The Gardens at Town Square in Bellevue, WA: every visit in the last three years, with each citation in the inspector’s own words. Back to the profile and its summaries.

Full record

3 visits, most recent first.

2026-04-01Complaint Investigation1 finding

Plain-language summary

A complaint investigation found that the facility failed to obtain prescribed eye drop medication for a resident in a timely manner, leaving a gap of about three weeks between when the original medication was discontinued on December 15, 2025, and when replacement eye drops were obtained and administered on January 5, 2026. This delay in providing the prescribed treatment placed the resident at risk for medical complications. A deficiency was cited under state regulations.

Type AWAC §WAC 388-78A-2240
Verbatim citation text · WAC §WAC 388-78A-2240

“The facility failed to obtain prescribed eye drop medication in a timely manner for a resident. The medication was discontinued around 12/15/2025, but the replacement compound eye drops were not obtained and administered until 01/05/2026, resulting in a gap in the resident's prescribed treatment and placing them at risk for medical complications.”

Read raw inspector notes

WAC 388-78A-2240: The facility failed to obtain prescribed eye drop medication in a timely manner for a resident. The medication was discontinued around 12/15/2025, but the replacement compound eye drops were not obtained and administered until 01/05/2026, resulting in a gap in the resident's prescribed treatment and placing them at risk for medical complications.

2025-04-01Complaint Investigation4 findings

Plain-language summary

A complaint investigation was conducted in April 2025, but the document does not specify what the complaint alleged or what the investigation found. To obtain details about this complaint and its outcome, you should contact Washington DSHS directly or request the full inspection report.

Type AWAC §WAC 246-980-030(2)
Verbatim citation text · WAC §WAC 246-980-030(2)

“Staff A worked as a long-term care worker for more than 200 calendar days from their hire date (04/16/2024) without obtaining home care aide or nursing assistant certification. As of 01/13/2025 (272 days after hire), Staff A had not completed and received the required certification despite providing direct care and administering medications to residents.”

Type AWAC §WAC 388-112A-0090(4)
Verbatim citation text · WAC §WAC 388-112A-0090(4)

“Staff A, a person in an approved nursing assistant training program, did not complete the training program within 120 days of hire date (04/16/2024). The training was completed on 10/30/2024 (197 days after hire), exceeding the 120-day requirement.”

Type AWAC §WAC 388-78A-2450(2)(e)
Verbatim citation text · WAC §WAC 388-78A-2450(2)(e)

“The facility failed to ensure that Staff A, who provided direct care and administered medications, was qualified to work with vulnerable adult residents. Staff A provided care and medication administration without completing required nursing assistant or home care aide certification.”

Type AWAC §WAC 388-78A-2450(3)(d)(i)(A) and (B)
Verbatim citation text · WAC §WAC 388-78A-2450(3)(d)(i)(A) and (B)

“The facility failed to maintain documentation of required staff training and certification pertinent to duties. Staff A's personnel file lacked documentation of completion of training required by WAC 388-112A and home care aide certification as required by WAC 246-980.”

Read raw inspector notes

WAC 246-980-030(2): Staff A worked as a long-term care worker for more than 200 calendar days from their hire date (04/16/2024) without obtaining home care aide or nursing assistant certification. As of 01/13/2025 (272 days after hire), Staff A had not completed and received the required certification despite providing direct care and administering medications to residents. WAC 388-112A-0090(4): Staff A, a person in an approved nursing assistant training program, did not complete the training program within 120 days of hire date (04/16/2024). The training was completed on 10/30/2024 (197 days after hire), exceeding the 120-day requirement. WAC 388-78A-2450(2)(e): The facility failed to ensure that Staff A, who provided direct care and administered medications, was qualified to work with vulnerable adult residents. Staff A provided care and medication administration without completing required nursing assistant or home care aide certification. WAC 388-78A-2450(3)(d)(i)(A) and (B): The facility failed to maintain documentation of required staff training and certification pertinent to duties. Staff A's personnel file lacked documentation of completion of training required by WAC 388-112A and home care aide certification as required by WAC 246-980.

2025-01-01Annual Compliance Visit1 finding

Plain-language summary

This standard survey is in the Washington Department of Social and Health Services public file. The citation is not written out as a sentence, so the original line is kept in the record.

InspectionsWAC §__wa_2d82bcecc07748073d5296fda574156e

Only the regulator’s PDF report is available — open it via the link below.

Read raw inspector notes

—: WA DSHS report: Inspections (01/2025)

Source: Washington DSHS · Aging and Disability Services Administration. DSHS inspection portal →

Related in this city

Other memory care options nearby.