D & a White Dove a L H: inspection reports
The ADHS record for D & a White Dove a L H in Phoenix, AZ: every visit in the last three years, with each citation in the inspector’s own words. Back to the profile and its summaries.
2 visits, most recent first.
2026-03-16Complaint Investigation11 findings
Plain-language summary
The following deficiencies were found during the on-site compliance inspection and investigation of complaint 00124107 conducted on March 16, 2026:
“Based on documentation review, record review, and interview, the manager failed to ensure that a resident provided evidence of freedom from infectious tuberculosis (TB) as specified in R9-10-113 before or within seven calendar days after the resident’s date of occupancy, for one of two residents sampled. The deficient practice posed a potential illness risk to residents. Findings include: 1. R9-10-113.A states, "If a health care institution is subject to the requirements of this Section, as specified in an Article in this Chapter, the health care institution's chief administrative officer shall ensure that the health care institution establishes, documents, and implements tuberculosis infection control activities that...2. Include: a. For each individual who is employed by the health care institution, provides volunteer services for the health care institution, or is admitted to the health care institution and who is subject to the requirements of this Section, screening, on or before the date specified in the applicable Article of this Chapter, that consists of: i. Assessing risks of prior exposure to infectious tuberculosis, ii. Determining if the individual has signs or symptoms of tuberculosis, and iii. Obtaining documentation of the individual's freedom from infectious tuberculosis according to subsection (B)(1)..." 2. A review of R1’s medical record revealed no documentation that assessed risks of prior exposure and signs and symptoms of TB. 3. In an exit interview, the findings were discussed with E1 and no additional information was provided. 4. Technical assistance was provided on this rule during the compliance inspection conducted on January 22, 2024.”
The home's plan of correction
Temporary Solution Upon identification of the deficiency, the manager immediately initiated steps to obtain and document the required TB screening information in accordance with R9-10-113. All current resident records were reviewed to verify the presence of required TB documentation. Name, title and/or Position of the Person Responsible Mihalia Ene-Neagu, Facility Manager Permanent Solution The facility reviewed and reinforced its admission policy requiring documentation of evidence of freedom from infectious tuberculosis, including a TB risk assessment and signs and symptoms screening, before or within seven calendar days after a resident's date of occupancy, in accordance with R9-10-113. A resident admission checklist was created to include verification of all required TB documentation and to ensure completion within the required timeframe. The manager is responsible for verifying that all required TB documentation is completed and maintained in the resident record. Date temporary correction was complete 2026-03-16 Monitoring The manager or manager designee will review all new resident admissions upon admission and within seven calendar days of occupancy every month for three months and quarterly thereafter. Any due items will be addressed promptly to ensure timely completion and documentation. Compliance will be verified through review of resident records to confirm that required TB documentation is completed within the required timeframe and maintained in the resident record. Date permanent correction will be complete 2026-03-16
“Based on record review, documentation review, and interview, the manager failed to ensure that a resident had a service plan that was signed and dated by the nurse or medical practitioner, for one of two residents sampled. The deficient practice posed a risk if the service plan was not developed to articulate decisions and agreements. Findings include: 1. A review of R2’s medical record revealed a service plan dated January 10, 2026, for directed care services. The service plan revealed R2 received medication administration. However, the service plan did not include a signature and date from a nurse or medical practitioner. 2. A review of the facility’s policies and procedures revealed a policy titled "Service Plan”. The policy stated, “For a resident who requires intermittent nursing services or medication administration, review by a nurse or medical practitioner.” 3. In an exit interview, the findings were discussed with E1 and no additional information was provided.”
The home's plan of correction
Temporary Solution On the day of the inspection, the manager immediately contacted the nurse utilized by the facility for service plan reviews. The manager-initiated steps to obtain the required nurse review, signature, and date for R2's service plan in accordance with facility policy. All resident service plans requiring nurse or medical practitioner review were audited to ensure required signatures and dates were present. Name, title and/or Position of the Person Responsible Mihalia Ene-Neagu, Facility Manager Permanent Solution The facility reviewed and reinforced its policy requiring service plans for residents receiving intermittent nursing services or medication administration to be reviewed, signed, and dated by a nurse or medical practitioner. A service plan review checklist was created to ensure all required signatures and dates are obtained prior to filing the service plan in the resident record. The manager is responsible for verifying completion of all required service plan documentation. Date temporary correction was complete 2026-03-17 Monitoring The manager or manager designee will review all initial and updated service plans requiring nurse or medical practitioner review upon completion and monthly for three months, then quarterly thereafter. Any due items will be addressed promptly to ensure timely completion and documentation. Compliance will be verified through review of resident records to confirm service plans are signed and dated by the nurse or medical practitioner as required and maintained in the resident record. Date permanent correction will be complete 2026-03-17
“Based on record review, documentation review, and interview, the manager failed to ensure that a caregiver documented the services provided in the resident’s medical record, for one of two residents sampled. The deficient practice posed a risk as services could not be verified as provided against a service plan. Findings include: 1. A review of R2's medical record revealed a service plan dated January 10, 2026. After further review, it was revealed that R2 received the following services: Bed bath, two times a weeks Dressing, two times a day Incontinence care every 2-3 hours (includes skin care) 2. A review of R2's medical record revealed documentation of activities of daily living for R2. However, no documentation of aforementioned activities of daily living was revealed for March 1, 2026 through March 16, 2026. 3. A review of the facility’s policies and procedures revealed a policy titled "Service Plan”. The policy stated, “1. A caregiver or an assistant caregiver: g. Documents the services provided in the resident’s medical record.” 4. In an interview, E1 reported services were provided. 5. In an exit interview, the findings were reviewed with E1, and no additional information was provided.”
The home's plan of correction
Temporary Solution On the day of the inspection, the manager immediately retrained caregivers on the requirement to document services provided in the resident’s medical record according to the resident’s service plan and facility policy at the time care is provided. The manager reviewed all current resident records to identify any missing documentation. Daily monitoring of resident records was started and will continue until the end of the month to ensure services are being documented correctly and in a timely manner. Name, title and/or Position of the Person Responsible Mihalia Ene-Neagu, Facility Manager Permanent Solution The facility reviewed and reinforced its policy requiring caregivers to document services provided in the resident’s medical record as outlined in the resident’s service plan. A documentation review process was implemented requiring routine reviews of resident records to ensure services provided, including activities of daily living, are documented in the resident’s medical record at the time the assistance or service is provided. The manager is responsible for ensuring caregivers are trained on documentation requirements and that documentation is maintained in the resident record. Date temporary correction was complete 2026-03-16 Monitoring The manager or manager designee will review resident records weekly for one month, then monthly for three months, and then quarterly thereafter to ensure services provided are documented in accordance with the resident’s service plan. Any due items will be addressed promptly to ensure timely and accurate documentation. Compliance will be verified through review of resident records to confirm required services are documented and maintained in the medical record. Date permanent correction will be complete 2026-03-16
“Based on documentation review and interview, the manager failed to ensure an evacuation drill for employees and residents was conducted at least once every six months. Findings include: 1. A review of the facility’s evacuation drills revealed documentation of an evacuation drill being conducted in February 2025 and August 2025. After further review, it was revealed that there was a blank evacuation drill document with a note to be completed in February 2026. 2. A review of the facility’s policies and procedures revealed a policy titled "Emergency and Safety Standards”. The policy stated, “An evacuation drill for employees and residents on the premises is conducted at least once every six months..." 3. In an exit interview, the findings were discussed with E1 and no additional information was provided.”
The home's plan of correction
Temporary Solution Upon discovery of the deficiency, the manager scheduled and conducted an evacuation drill for employees and residents following the inspection. Documentation of the completed evacuation drill is now available for review. Name, title and/or Position of the Person Responsible Mihalia Ene-Neagu, Facility Manager Permanent Solution The facility reviewed and reinforced its policy requiring evacuation drills for employees and residents to be concted at least once every six months. The evacuation drill requirement was added to the facility's annual tracking log to ensure drills are completed and documented as required. The manager is responsible for ensuring evacuation drills are conducted and documented within the required timeframe. Date temporary correction was complete 2026-03-17 Monitoring The manager or manager designee will review the annual tracking log monthly to ensure evacuation drills are completed and documented on time. Any due items will be addressed promptly. Compliance will be verified by confirming evacuation drills are conducted at least once every six months, maintained in the facility records and be available for review. Date permanent correction will be complete 2026-03-17
“Based on observation, documentation review, and interview, the manager failed to ensure poisonous or toxic materials stored by the assisted living facility were maintained in a locked area and were inaccessible to residents. The deficient practice posed a risk to the physical health and safety of a resident. Findings include: 1. During an environmental tour, the Compliance Officer observed the following: Disinfectant Spray in an unlocked upper cabinet located in the laundry room Three containers of Weed and Grass Killer in a box, located in the backyard 2. A review of the facility’s policies and procedures revealed a policy titled "Safety of the Facility and Grounds”. The policy stated, “Poisonous and toxic materials will be in labeled containers and stored in a locked area separate from food preparation and food storage areas.” 3. In an exit interview, the findings were discussed with E1 and no additional information was provided. 4. Technical assistance was provided on this rule during the compliance inspection conducted on January 22, 2024.”
The home's plan of correction
Temporary Solution Upon discovery of the deficiency, the manager immediately secured the disinfectant spray and weed and grass killer in a locked area inaccessible to residents. The manager conducted a walkthrough of the facility premises to identify any additional poisonous or toxic materials that were not properly secured and ensured all such items were placed in a locked storage area inaccessible to residents. Name, title and/or Position of the Person Responsible Mihalia Ene-Neagu, Facility Manager Permanent Solution The manager and staff reviewed and reinforced the facility's policy requiring poisonous and toxic materials to be stored in a locked area and remain inaccessible to residents. Staff were retrained on the proper storage requirements for hazardous materials and the importance of ensuring these items remain secured and inaccessible to residents at all times. The manager implemented routine environmental safety checks to verify that all poisonous and toxic materials are properly secured. The manager is responsible for ensuring poisonous and toxic materials are stored in accordance with facility policy. Date temporary correction was complete 2026-03-16 Monitoring The manager or manager designee will conduct environmental safety checks weekly for one month and then monthly thereafter to ensure poisonous and toxic materials are stored in locked areas and remain inaccessible to residents. Any issues identified will be addressed promptly. Compliance will be verified through routine observation and documentation of environmental safety checks. Date permanent correction will be complete 2026-03-16
“Based on observation and interview, the manager failed to ensure a swimming pool was locked when the swimming pool was not in use. The deficient practice posed a risk if residents had unsupervised access to the swimming pool. Findings include: 1. During an environmental tour, the Compliance Officer observed that the gate latch for the pool was unlocked at the time of the inspection and residents were not using the pool. 2. In an interview, E1 reported residents did not use the pool. 3. In an exit interview, the findings were discussed with E1, and no additional information was provided.”
The home's plan of correction
Temporary Solution Upon discovery of the deficiency, the manager immediately secured and locked the pool gate to prevent unsupervised resident access to the swimming pool. The manager verified that the gate latch was functioning properly and educated staff on the requirement to keep the pool area locked when not in use. Name, title and/or Position of the Person Responsible Mihalia Ene-Neagu, Facility Manager Permanent Solution The manager and staff reviewed and reinforced the facility's policy requiring the swimming pool to remain locked when not in use. Staff were retrained on pool safety requirements and the importance of ensuring the pool gate remains locked at all times when residents are not using the pool. The manager implemented routine environmental safety checks to verify that the pool gate is secured and locked when not in use. The manager is responsible for ensuring compliance with pool safety requirements. Date temporary correction was complete 2026-03-16 Monitoring The manager or manager designee will conduct weekly checks of the pool gate for one month and then monthly thereafter to ensure the gate remains locked when the pool is not in use. Any issues identified will be addressed promptly. Compliance will be verified through routine observation and documentation of pool safety checks. Date permanent correction will be complete 2026-03-16
“Based on documentation review and interview, the manager failed to ensure that policies and procedures were reviewed at least once every three years. The deficient practice posed a risk as policies and procedures reinforce and clarify standards expected of employees. Findings include: 1. A review of the facility’s policies and procedures manual revealed a review of the policies conducted on February 14, 2022. However, no documentation of a policies and procedures review from the past three years was revealed. 2. A review of the facility’s policies and procedures revealed a policy titled "R9-10-803.C.3”. The policy stated, “It is reviewed at least once every three years and updated as needed.” 3. In an exit interview, the findings were discussed with E1 and no additional information was provided.”
The home's plan of correction
Temporary Solution On the day of the inspection, the manager immediately reviewed the facility’s policies and procedures manual. The manager signed and dated the manual to document completion of the required review at that time. Name, title and/or Position of the Person Responsible Mihalia Ene-Neagu, Facility Manager Permanent Solution The policies and procedures manual review requirement was added to the annual tracking log to ensure timely monitoring and documentation. All reviews will be completed and documented as per due date. The manager is responsible for ensuring the tracking log is maintained and that all required reviews are completed and documented. Date temporary correction was complete 2026-03-16 Monitoring The manager or manager designee will review the annual tracking log monthly for three months and then quarterly thereafter. Any due items will be addressed promptly to ensure timely completion and documentation of the required review. Compliance will be verified by confirming that all policies are reviewed within the required timeframe and properly documented. Date permanent correction will be complete 2026-03-16
“Based on documentation review, record review, and interview, the manager failed to ensure a caregiver provided evidence of freedom from infectious tuberculosis (TB) on or before the date the individual began providing services at the assisted living facility and as specified in R9-10-113, for one of two personnel sampled. The deficient practice posed a potential illness risk to residents. Findings include: 1. R9-10-113.A states, "If a health care institution is subject to the requirements of this Section, as specified in an Article in this Chapter, the health care institution's chief administrative officer shall ensure that the health care institution establishes, documents, and implements tuberculosis infection control activities that...2. Include: a. For each individual who is employed by the health care institution, provides volunteer services for the health care institution, or is admitted to the health care institution and who is subject to the requirements of this Section, screening, on or before the date specified in the applicable Article of this Chapter, that consists of: i. Assessing risks of prior exposure to infectious tuberculosis, ii. Determining if the individual has signs or symptoms of tuberculosis, and iii. Obtaining documentation of the individual's freedom from infectious tuberculosis according to subsection (B)(1)..." 2. A review of the facility’s policies and procedures revealed a policy titled "Tuberculosis (TB) Testing”. The policy stated, “On or before the date the individual begins providing services at the facility (employee), or is admitted to the facility (resident), one of the following as evidence of freedom from infectious tuberculosis: i. Documentation of a negative Mantoux skin test administered within six months before the date the employee begins providing services…” 3. A review of the facility's employee work schedule revealed a schedule for March 2026. The schedule indicated E2 was scheduled to work everyday from 6:00 AM - 6:00 PM. 4. A review of E2’s personnel record revealed no documentation of a TB skin test, risk assessment, or signs and symptoms. 5. In an interview, R1 reported E2 assists at the facility. 6. In an interview, E1 reported E2 had not received their TB test yet. 7. In an exit interview, the findings were discussed with E1 and no additional information was provided. 8. Technical assistance was provided on this rule during the compliance inspection conducted on January 22, 2024.”
The home's plan of correction
Temporary Solution Upon identification of the deficiency, the caregiver was immediately removed from providing services. The caregiver was not permitted to provide services because required documentation of freedom from tuberculosis (TB) was not present in the personnel record. The manager began the process of obtaining the required TB documentation. E2's employment was terminated, and E2 is no longer employed by the facility. Name, title and/or Position of the Person Responsible Mihalia Ene-Neagu, Facility Manager Permanent Solution The facility reinforced its policy requiring evidence of freedom from tuberculosis (TB) prior to employment and prior to being added to the work schedule or providing services to residents, in accordance with R9-10-113. The onboarding process was updated to ensure TB screening is completed and documented before staff are added to the work schedule to provide services. The manager is responsible for ensuring compliance with this requirement for all new hires. Date temporary correction was complete 2026-03-17 Monitoring The manager or manager designee will review all new hire personnel files prior to scheduling monthly for three months, then quarterly thereafter. Any employee without verified TB documentation will not be added to the work schedule or permitted to provide services until requirements are met and documented. Compliance will be verified by confirming that all employees have required TB clearance documented before providing services. Date permanent correction will be complete 2026-03-17
“Based on record review, documentation review, and interview, the manager failed to ensure that before or at the time of acceptance of an individual, the individual submitted documentation that was dated 90 calendar days before the individual was accepted by an assisted living facility and included whether the individual required continuous medical services, continuous or intermittent nursing services, or restraints and was signed and dated by a medical practitioner, for one of two residents sampled. The deficient practice posed a risk if the facility was unable to meet a resident’s needs. Findings include: 1. A review of R1’s medical record revealed documentation that included whether the individual required continuous medical services, continuous or intermittent nursing services, or restraints before or at the time of admission. However, the documentation was not signed and dated by a physician, registered nurse practitioner, registered nurse, or physician assistant. 2. A review of the facility’s policies and procedures revealed a policy titled "Residency Agreement”. The policy stated, “The manager or manager’s designee shall ensure that before or at the time of the acceptance of an individual, the individual submits documentation that is dated within 90 calendar days before the individual is accepted by the facility…” 3. In an exit interview, the findings were discussed with E1 and no additional information was provided. This is a repeat deficiency from the compliance inspection conducted on January 29, 2024.”
The home's plan of correction
Temporary Solution On the day of the inspection, the manager contacted the medical practitioner to obtain the required signature and date for R1’s admission documentation. The documentation confirming whether the individual required continuous medical services, continuous or intermittent nursing services, or restraints prior to or at the time of admission is now signed and available for review in R1’s record. Name, title and/or Position of the Person Responsible Mihalia Ene-Neagu, Facility Manager Permanent Solution The manager reviewed its Residency Agreement policy requiring that, before or at the time of acceptance, individuals provide documentation dated within 90 calendar days and signed and dated by a physician, nurse practitioner, registered nurse, or physician assistant. A pre-admission checklist was created to make sure all required documents are complete, signed, and dated before admission is finalized. The manager is responsible for checking that all admission paperwork meets policy requirements before a resident is accepted. Date temporary correction was complete 2026-03-17 Monitoring The manager or manager designee will review all new admission records upon admission and monthly for three months, then quarterly thereafter to ensure required documentation is complete, signed, and dated as required. Any due items will be addressed promptly to ensure timely completion and documentation. Compliance will be verified through review of admission records to confirm required documentation is properly completed and maintained in the resident record. Date permanent correction will be complete 2026-03-16
“Based on record review, documentation review, and interview, the manager failed to ensure that the service plan for a resident receiving directed care services included strategies to ensure a resident’s personal safety, for one of two residents sampled. The deficient practice posed a risk as the service plan did not reinforce and clarify the services to be provided to a resident. Findings include: 1. A review of R2’s medical record revealed a current service plan dated January 10, 2026. The service plan indicated R2 received directed care services. R2’s service plan did not include strategies to ensure a resident’s personal safety. 2. A review of the facility’s policies and procedures revealed a policy titled, “Directed Care Services”. The policy stated, “The amount, type and frequency of assisted living services being provided to the resident shall include direct services including: ii. Strategies to ensure a resident’s personal safety…" 3. In an exit interview, the findings were discussed with E1 and no additional information was provided.”
The home's plan of correction
Temporary Solution On the day of the inspection, the manager contacted the nurse used by the facility for developing service plans and began the process to update R2’s service plan to include strategies to ensure personal safety in accordance with facility policy. The updated service plan is now available for review in R2’s record. The manager also reviewed other directed care service plans to identify any additional missing required elements. Name, title and/or Position of the Person Responsible Mihalia Ene-Neagu, Facility Manager Permanent Solution The manager reviewed the requirement with the nurse and caregivers to ensure understanding of strategies to ensure a resident’s personal safety. The review included how to identify and include individualized safety strategies in each resident’s service plan based on the resident’s needs. A service plan checklist was created to ensure all required elements, including safety strategies, are included for residents receiving directed care services. This process was implemented to ensure service plans are individualized, complete, and in accordance with facility policy. Date temporary correction was complete 2026-04-10 Monitoring The manager or manager designee will review service plans for directed care residents upon completion and monthly for three months, then quarterly thereafter to ensure required safety strategies are included. Any due items will be addressed promptly to ensure timely and accurate completion of service plans. Compliance will be verified through review of resident records to confirm required service plan elements are included and properly documented Date permanent correction will be complete 2026-04-10
“Based on documentation review, observation, and interview, the manager failed to ensure that there was a means of exiting the facility that monitored or alerted employees of the egress of a resident from the facility. This deficient practice posed a risk if the facility was unaware of the general or specific whereabouts of a resident. Findings include: 1. A review of Department documentation revealed the facility was licensed to provide directed care services. 2. During an environmental tour, the Compliance Officer observed an unmonitored exit door in the kitchen that led to the backyard. After further observation, the Compliance Officer observed that the monitor was not working as no sound was produced. 3. In an interview, E1 reported that E1 would get the alarm fixed. 4. In an exit interview, the findings were discussed with E1, and no additional information was provided.”
The home's plan of correction
Temporary Solution On the day of the inspection, the manager-initiated repair of the alarm on the exit door in the kitchen that leads to the backyard and ensured staff were aware of the unmonitored exit until it was corrected. The exit door was monitored by staff to ensure resident safety. The alarm was repaired on the day of the inspection and is now functioning properly. Name, title and/or Position of the Person Responsible Mihalia Ene-Neagu, Facility Manager Permanent Solution The facility reviewed and reinforced its requirement to maintain monitored exit doors to ensure residents do not exit the facility unnoticed. The malfunctioning exit alarm system was repaired to ensure proper function and to alert employees of the egress of a resident from the facility. A system was implemented for routine checks of all exit door alarms to ensure they are operational and alert staff when activated. Employees and the manager designee are required to notify the manager immediately if any exit alarm is not functioning. The manager is responsible for ensuring exit monitoring systems are maintained in working order. Date temporary correction was complete 2026-03-16 Monitoring The manager or manager designee will check all exit door alarms daily for one week, then weekly for one month, and then monthly thereafter to ensure they are working properly. Employees and the manager designee must notify the manager right away if any exit alarm is not working. Any issues will be corrected promptly to ensure continuous monitoring of exits. Compliance will be verified through alarm check logs[j7.1], staff reports, and routine observation of alarm function. Date permanent correction will be complete 2026-03-16
2024-01-22Annual Compliance Visit3 findings
Plain-language summary
The following deficiencies were found during the attempted on-site compliance inspection conducted on January 22, 2024 and the on-site compliance inspection conducted on January 29, 2024:
“Based on documentation review, observation, and interview, the licensee failed to provide complete acquiescence in any entry or inspection of the premises during the term of the license. The deficient practice posed a risk as the Department was unable to determine substantial compliance. Findings include: 1. Review of the Department documentation revealed the facility's perpetual license was effective on June 15, 2022. 2. The Compliance Officer arrived at the facility on January 22, 2023, at 8:58am to conduct a compliance inspection. The Compliance Officer observed a fence completely surrounding the facility with a locked gate crossing the driveway and a locked gate crossing the walking path to the front door. One vehicle was observed parked in the driveway. The Compliance Officer was not able to access the front door. The Compliance Officer attempted to contact E1 by telephone on one telephone number provided to the Department at 9:01am. The telephone number was not operational. Additionally, the Compliance Officer attempted to contact E1 by telephone at 9:12am with the telephone number listed on the Board of Examiners for Nursing Care Institution Administrators and Assisted Living Facility Managers website. The telephone number was a wrong number. The Compliance Officer departed from the facility at 9:15am after not gaining entry to the facility.”
The home's plan of correction
Date permanent correction will be complete 2024-01-29
“Based on observation and interview, the manager failed to ensure a fire extinguisher labeled as rated at least 2A-10-BC by the Underwriters Laboratories was mounted and maintained in the assisted living home. The deficient practice posed a health and safety risk to the residents if a fire extinguisher was needed. Findings include: 1. During an environmental inspection of the facility with E1, the Compliance Officer observed a fire extinguisher with a rating of 1A-10-BC. A fire extinguisher with a rating of 2A-10-BC was not available. 2. In an interview, E1 acknowledged a fire extinguisher with a rating of at least 2A-10-BC was not available.”
The home's plan of correction
Date permanent correction will be complete 2024-02-02
“Based on record review and interview, the manager failed to ensure a resident accepted by the assisted living facility submitted documentation signed by a medical practitioner or a registered nurse stating whether the individual required continuous medical services, continuous or intermittent nursing services, or restraints, for one of one resident reviewed accepted by the assisted living facility on or after October 1, 2013. The deficient practice posed a risk if the facility was unable to meet a resident's needs. Findings include: 1. Review of R1's medical record revealed no documentation stating whether the resident required continuous medical services, continuous or intermittent nursing services, or restraints. Based on R1's acceptance date, this documentation was required. 2. In an interview, E1 acknowledged documentation was not available that showed R1 provided documentation signed by a medical practitioner or a registered nurse stating whether the resident required continuous medical services, continuous or intermittent nursing services, or restraints.”
The home's plan of correction
Date permanent correction will be complete 2024-01-29
Source: Arizona Dept. of Health Services · Bureau of Residential Facilities Licensing. ADHS inspection portal →
Other memory care options nearby.
Stetson Hills Assisted Living LLC
Phoenix
Desert Sanctuary Assisted Living LLC
Phoenix
Pure Essence Family Living LLC
Phoenix
Iocam Assisted Living Home
Phoenix
Valley Assisted Living LLC
Phoenix
Paseo Highlands Assisted Living
Phoenix
Deer Valley Care Home, LLC
Phoenix
Happy Valley Assisted Living
Phoenix
Oasis Care Homes II
Phoenix
Tbi Care, Inc.
Phoenix
Angel Hands Home Care LLC
Phoenix
Oasis Care Homes, LLC
Phoenix