2025-03-28Annual Compliance Visit3 findings

Plain-language summary

The following deficiencies were found during the on-site compliance inspection conducted on March 28, 2025:

R9-10-818.A.2A.A.C. § RR9-10-818.A.2
Verbatim citation text · A.A.C. § RR9-10-818.A.2

“Based on documentation review and interview, the manager failed to ensure the disaster plan required in subsection (A)(1) was reviewed at least once every 12 months. Findings include: 1 . A review of facility documentation revealed documentation of a disaster plan review was not available for review at the time of inspection. 2 . In an interview, E1 acknowledged documentation of a disaster plan review was not available for review at the time of inspection.”

The home's plan of correction

Temporary Solution Our disaster plan was recently discussed in a meeting with our employees, on March 15, notes were taken but not transferred to disaster plan review. Disaster plan review created on April 12. Name, title and/or Position of the Person Responsible Mark Hoskins- Manager Permanent Solution Each of our Caregivers will be assigned a Disaster Drill every other month Starting in April. These disaster drills will be based on real life disasters or fictional/realistic situations. They will be recorded on a new disaster plan after drill has taken place. Directly after drill and as a team we will discuss changes and improvements we can make for enhanced safety of our residents and personnel. At the same time we will complete the Disaster Plan Review. Date temporary correction was complete 2025-04-12 Monitoring Bi-monthly meetings will be placed on the company calendar and a group email and text reminder will be sent out to all employees. Times will be assigned to rotate day and night shifts. Each Disaster Plan and Disaster Plan review will be put in and in the back of our "IR", incident report book for future reference. Date permanent correction will be complete 2025-04-25

R9-10-806.A.8A.A.C. § RR9-10-806.A.8
Verbatim citation text · A.A.C. § RR9-10-806.A.8

“Based on record review and interview the manager failed to ensure a manager or a caregiver provides evidence of freedom from infectious tuberculosis (TB) as specified in R9-10-113, for three of three employees sampled. Findings include: 1 . A review of E1's personnel record revealed documentation of two TB skin tests. However, documentation of a TB screening questionnaire was not available for review at the time of inspection. 2 . A review of E2's and E3's personnel records revealed documentation of a TB skin test, E2 on January 9, 2022 and E3 on April 3, 2023. However, documentation of a second TB skin test and a TB screening questionnaire was not available for review at the time of inspection. 3 . In an interview, E1 reported E1 believed the facility was in compliance with current TB requirements. E1 acknowledged E1, E2 and E3 were missing TB documentation as required by R9-10-113.”

The home's plan of correction

Temporary Solution Manager, Caregiver and Assistant Caregiver all have received their 2 TB tests and Questionnaires completed. Name, title and/or Position of the Person Responsible Mark Hoskins- Manager Permanent Solution Existing employees now have completed 2 TB tests, at least with 1 to 3 weeks of separation, with accompanying questionnaire signed by healthcare professional. Our Employee packet has been changed to reflect the need for 2 TB tests with questionnaire signed by healthcare professional. The same applies to our Policy and Procedures book, so all can access this information. Date temporary correction was complete 2025-04-10 Monitoring As each new employee is added the completed checklist will be verified by Manager and manager designee at the beginning of each month. The checklist contains the need for 2 Tests and completed questionnaire so this will prove compliance. Date permanent correction will be complete 2025-04-22

R9-10-819.A.11A.A.C. § RR9-10-819.A.11
Verbatim citation text · A.A.C. § RR9-10-819.A.11

“Based on observation and interview, the manager failed to ensure that poisonous or toxic materials stored by the assisted living facility were inaccessible to residents. Findings include: 1 . During an environmental inspection of the facility, the Compliance Officer observed a cabinet under a bathroom sink adjacent to a resident's room. The bathroom cabinet had a magnetic lock on it; however, the lock would not engage when the cabinet was closed. Inside the cabinet was two bottles of "Great Value" glass cleaner and a bottle of "Comet Classic" foam bath cleaner. 2 . During an environmental inspection of the facility, the Compliance Officer observed a cabinet under the kitchen sink. The cabinet had a magnetic lock on it, however the lock was broken, and unable to function. Inside the cabinet was a container of "Great Value" advanced dishwasher pacs. 3 . In an interview, E1 acknowledged the toxins in the cabinets were accessible to residents.”

The home's plan of correction

Temporary Solution On cabinet #1 bent hinges were realigned and lock was replaced. Kitchen sink lock was also replaced, each of these locks were tested multiple times by multiple people. Name, title and/or Position of the Person Responsible Mark Hoskins- Manager Permanent Solution All locks have been checked, magnets that actuates the locks have been relocated in logical secure locations. Date temporary correction was complete 2025-03-28 Monitoring At the beginning of each month, all secure shelves and doors will be checked to verify functionality. Date permanent correction will be complete 2025-03-28