Better Life Assisted Living 2: inspection reports
The ADHS record for Better Life Assisted Living 2 in Mesa, AZ: every visit in the last three years, with each citation in the inspector’s own words. Back to the profile and its summaries.
2 visits, most recent first.
2026-10-29Complaint InvestigationNo findings
Plain-language summary
The following deficiencies were found during the on-site compliance inspection and investigation of complaints 00188105 and 00188033 conducted on October 29, 2026:
2025-06-11Annual Compliance Visit4 findings
Plain-language summary
The following deficiencies were found during the on-site compliance inspection conducted on June 11, 2025:
“Based on record review and interview the manager failed to ensure that medication was administered to a resident and documented in the resident's medical record. The deficient practice posed a risk to the resident's health and safety if it could not be determined that the medication was given as ordered, and the Department was provided false and misleading information. Findings include: 1. A review of R1's medication administration record (MAR) revealed Atorvastatin calcium 40 mg 1 tablet every day. The medication was scheduled for 8 pm; however, the caregiver signed off for the medication during the morning med pass. 2. In an interview, E4 and E2 reported that E2 signed off on the MAR for a medication in the morning, which was scheduled for administration in the evening. E4 acknowledged that a medication was signed off, as administered, at the wrong time of day.”
The home's plan of correction
Temporary Solution manager and owner conducted a meeting immediately to train and show the caregiver the importance of checking the right medication sign off to the right time Name, title and/or Position of the Person Responsible zaida Guzman Permanent Solution manager will check the MAR often and reminding caregivers to sign off to the right time of the medication given Date temporary correction was complete 2025-06-11 Monitoring will check mar with caregiver on daily basis Date permanent correction will be complete 2025-06-12
“Based on observation and interview the manager failed to ensure that oxygen containers were secured in an upright position. Findings include: 1 . During the environmental tour of the facility the Compliance Officer observed three (3) Oxygen tanks stored in a locked hallway closet. However, the Oxygen tanks were not secured. 2 . In an interview, E4 acknowledged that there were Oxygen tanks stored in the hallway closet and not secured.”
The home's plan of correction
Temporary Solution manager will make sure that the oxygen tank will be secured and on upright position. remove the oxygen from the property. Name, title and/or Position of the Person Responsible zaida Guzman Permanent Solution will make sure oxygen tank is secured. Remove the oxygen tank in the property if no one use Date temporary correction was complete 2025-06-12 Monitoring Manager will do regular check if we the home has a oxygen Date permanent correction will be complete 2025-06-12
“Based on record review and interview, the manager failed to ensure that before or at the time of acceptance of an individual submitted documentation that was dated within 90 calendar days before the individual was accepted by an assisted living facility and included whether the individual required continuous medical services, continuous or intermittent nursing services, or restraints and was signed and dated by a medical practitioner, for one of two residents sampled. The deficient practice posed a risk if the facility was unable to meet a resident's needs. The deficient practice posed a risk if the facility was unable to meet a resident's needs. Findings include: 1. A review of R1's medical records revealed no documentation stating if the resident required continuous medical services, continuous or intermittent nursing services, or restraints. Based on the date of acceptance for R1, this document was required. 2. In an interview, E4 acknowledged that there was not documentation dated within 90 calendar days before R1 was accepted by the assisted living facility.”
The home's plan of correction
Temporary Solution manager will ensure to check complete admission paperwork prior and upon move in of the resident, especially the Determinaton of admission form signed by the primary care physician. Name, title and/or Position of the Person Responsible Zaida Guzman/ owner Permanent Solution Manager will monitor residents file on regular basis Date temporary correction was complete 2025-06-13 Monitoring will have a calendar notes Date permanent correction will be complete 2025-06-13
“Based on observation and interview the manager failed to ensure that the premises used at the assisted living facility were free from a condition or situation that may cause a resident or other individual to suffer physical injury. Findings include: 1 . During the environmental tour of the facility the Compliance Officer observed a ramp leading from the backdoor to the backyard. However there was a gap larger than 2 inches, at the base of the ramp, that could be a trip hazard for residents or other individuals at the assisted living facility. 2 . During the environmental tour of the facility the Compliance Officer observed a paved patio area and pavers leading to the patio area that were not level with the ground and could cause a trip hazard for residents or other individuals at the assisted living facility. 3 . In an interview, E4 acknowledged that the premises were not free from a condition or situation that may cause a resident or other individual to suffer physical injury.”
The home's plan of correction
Temporary Solution manager immediately replace the ramp, pavers was removed right after the inspection. Name, title and/or Position of the Person Responsible zaida Guzman Permanent Solution manager hire a contractor to replace and re-do the pavers and renovated the backyard its on going work Date temporary correction was complete 2025-06-11 Monitoring manager will include the check on the quality management Date permanent correction will be complete 2025-09-30
Source: Arizona Dept. of Health Services · Bureau of Residential Facilities Licensing. ADHS inspection portal →
Other memory care options nearby.
Summer Blossoms Assisted Living, LLC
Mesa
Embrace Assisted Living, LLC
Mesa
Meliora Health Assisted Living LLC
Mesa
Medina House Corp
Mesa
Home Sweet Home
Mesa
Desert Oasis at Superstition Assisted Living
Mesa
Portobello Assisted Living Home LLC
Mesa
Triple Hearts Assisted Living I LLC
Mesa
Amanda's Care Home
Mesa
Silver Creek Inn Memory Care Community
Mesa
Little Flower Assisted Living Home
Mesa
Bella Vista Assisted Living Home, LLC
Mesa