Solterra Senior Living: inspection reports
The ADHS record for Solterra Senior Living in Chandler, AZ: every visit in the last three years, with each citation in the inspector’s own words. Back to the profile and its summaries.
29 visits, most recent first.
2026-09-02Complaint InvestigationNo findings
Plain-language summary
No deficiencies were found during the on-site investigation of complaints 00173480 and 00184867 conducted on September 2, 2026.
2026-07-16Complaint InvestigationNo findings
Plain-language summary
The following deficiencies were found during the on-site investigation of complaint 00177233 conducted on July 16, 2026:
2026-06-24Complaint InvestigationNo findings
Plain-language summary
No deficiencies were found during the on-site investigation of complaint 00174535 conducted on June 24, 2026.
2026-06-08Complaint InvestigationNo findings
Plain-language summary
No deficiencies were found during the on-site investigation of complaint 00172766 was conducted on June 8, 2026.
2026-05-14Complaint Investigation4 findings
Plain-language summary
The following deficiencies were found during the on-site compliance inspection and investigation of complaints 00163707 and 00169008 conducted on May 14, 2026:
“Based on observation and interview, the manager failed to ensure policies and procedures were available to employees of the assisted living facility. The deficient practice posed a risk as policies and procedures reinforce and clarify standards expected of employees. Findings include: 1. The Compliance Officers did not observe a physical copy of the policy and procedures or an electronic version of the policies and procedures on site at the facility. 2. In an interview, E1 reported that the policies and procedures were being sent from the regional team located outside of Arizona. When the Compliance Officers asked to see a specific policy, the Compliance Officers were provided the wrong policy. 3. In an interview, E1 acknowledged E1 and E2 were waiting for the regional team to send over the policies and procedures to provide for the inspection. 4. In an exit interview, the findings were reviewed with E1 and E2, and no additional information was provided.”
“Based on documentation review and interview, the manager failed to ensure that a disaster drill for employees was conducted on each shift at least once every three months and documented. The deficient practice posed a risk if employees were unable to implement a disaster plan. Findings include: 1. A review of the facility's personnel schedule revealed there were three shifts: -1st shift: 6 am-2 pm; -2nd shift: 2 pm-10 pm; and -3rd shift: 10 pm-6 am. 2. A review of the facility's disaster drills revealed documentation of a disaster drill conducted on January 3, 2025, during all three shifts. However, documentation of additional drills was not available for review at the time of inspection. 3. In an exit interview, the findings were reviewed with E1 and E2 and no additional information was provided.”
“Based on documentation review and interview, the manager failed to ensure an evacuation drill for employees and residents was conducted at least once every six months and included all individuals on the premises except for a resident whose medical record contains documentation that evacuation from the assisted living facility would cause harm to the resident. The deficient practice posed a risk if employees were unable to implement the evacuation plan. Findings include: 1. A review of the facility's evacuation drills for employees and residents revealed no documentation of evacuation drills conducted at least once every six months for the past 12 months. 2. In an exit interview, the findings were reviewed with E1 and E2 and no additional information was provided.”
“Based on documentation review and interview, the manager failed to ensure that for an assisted living facility authorized to provide directed care services, an elopement drill for employees was conducted every six months on each shift. Findings include: 1. A review of facility documentation revealed no documentation of elopement drills. 2. In an exit interview, the findings were reviewed with E1 and E2, and no additional information was provided.”
2026-05-04Complaint Investigation1 finding
Plain-language summary
The following deficiency was found during the on-site investigation of complaint 00168558 conducted on May 4, 2026:
“Based on observation and interview, the manager failed to ensure that a resident's sleeping area that is in the residential unit had a bathroom that provided privacy when in use and contained a window that opens or another means of ventilation. The deficient practice posed a health and safety risk to the residents. Findings include: 1. During a tour of the facility, the Compliance Officer observed an exhaust fan in R3's bathroom, but the exhaust fan did not work when the Compliance Officer attempted to turn it on, nor was there a window in R3's bathroom. 2. In an exit interview, the findings were reviewed with E1 and E3, and no additional information was provided.”
2026-01-16Complaint InvestigationNo findings
Plain-language summary
No deficiencies were found during the on-site investigation of complaints 00154747, 00154735, and 00154635 conducted on January 16, 2026
2025-12-22Complaint InvestigationNo findings
Plain-language summary
No deficiencies were found during the on-site investigation of complaint 00153133 conducted on December 22, 2025.
2025-12-11Complaint Investigation4 findings
Plain-language summary
The following deficiencies were found during the on-site investigation of complaint 00152891, 00152130, and 00151571 conducted on December 11, 2025:
“Based on record review and interview, the manager failed to ensure a caregiver or an assistant caregiver documented the services provided to a resident in the resident's medical record, for two of three sampled residents. The deficient practice posed a health and safety risk as services could not be verified as provided against a service plan. Findings include: 1. Review of R2’s current service plan dated, October 2025 revealed the following services were provided to R2: - “Level of Assistance- Bathing: Total Resident is dependent on others to provide bath, including shampoo” - “Level of Assistance- Grooming/ Personal Hygiene: Total Resident is dependent on others to provide all grooming/ personal hygiene needs/ 1 time(s) per day, everyday. - “Level of Assistance- Dressing: Total Resident is dependent upon others to do all dressing/ undressing/ 2 times(s) per day, everyday.” - “Level of Assistance- Toileting: Total Resident requires physical assistance with all tasks related to toileting. May require assistance with closed drainage system/ catheter. / 2 time(s) per day, every day.” 2. Review of R2’s activities of daily living (ADL) for the month of November 2025 revealed the following services were marked with “INF” for the entire month of November: - Bathing - Grooming/ Personal Hygiene - Dressing - Toileting It is unclear if a caregiver has completed this service. 3. Review of R3’s current service plan dated October 2025 revealed the following services were provided to R3: - “Monitor resident for desires to leave community/ 3 time(s) per day, every day. 4. Review of R3’s ADL revealed for the month of November 2025 revealed the following services were marked with “INF”. - “Monitor resident for desires to leave community” is marked “INF” from 18th to the 30th. It is unclear if a caregiver has completed this service. 5. In an interview, E1 reported that “INF” means Info only. E1 also reported its a glitch in the system not allowing the caregivers to chart the services that were completed. 6. In an exit interview, the findings were reviewed with E1, and no additional information was provided.”
The home's plan of correction
Temporary Solution The ADL documentation for R2 and R3 was immediately reviewed. Management reviewed current documentation for both residents to verify services are now being properly recorded. Name, title and/or Position of the Person Responsible Sandra O'Connell, ED Permanent Solution The electronic ADL documentation system was corrected to eliminate the “INF” (Info Only) glitch that prevented proper charting of completed services. A full audit of all residents’ ADL documentation for the previous 30 days was conducted to identify any additional entries marked “INF” that may have prevented accurate documentation. Any affected records were reviewed and corrected as appropriate. Date temporary correction was complete 2025-12-12 Monitoring The Wellness Director will audit five (5) resident ADL records per week for 60 days to ensure services are properly documented according to the service plan. Date permanent correction will be complete 2025-12-31
“Based on record review and interview, the manager failed to ensure the health, safety, or welfare of a resident was not placed at risk of harm. The deficient practice posed a risk to health and safety. Findings include: 1. Review of the R2’s medical record revealed an incident report dated November 11, 2025. This incident report stated, “Resident accidently drove [R2’s] electric wheelchair into the door frame, which caused the controller to move forward unexpectedly. This resulted in the wheelchair accelerating and colliding with [R2’s] dresser and then [R2’s] bed, pinning [R2’s] left foot between the bed and wheelchair. Resident was assisted and the wheelchair was powered off assessment completed: bruising swelling, redness, pain level- 8, unable to bear weight. Vital signs obtained. Ice applied/ elevated as appropriate. Resident instructed to report any increased pain of changes. Provider hospice per protocol. Will continue to monitor.” 2. Review of R2’s medical record revealed a document titled, “Progress Note” which stated the following: - “11/12/25 - Resident is bedridden right now from [R2’s] leg injury. [R2] needs to be fed meals and changed every 2 hours.” - “11/13/25 - … Resident just wanted jello and lemonade for lunch and [R2] refused breakfast due to not wanting to move. Resident needs help with drinking water and food.” - “11/14/25 - Resident was feeling unwell this morning [R2] was very confused with where [R2] was, [R2] was also very scared about why [R2] can’t move. Resident was reassured that is safe is in Solterra senior living. Resident did eat breakfast but small portions. Water was being given every 30 minutes through morning shift. Resident family has requested [R2] and encourage [R2] to go to the hospital for x ray for [R2’s] legs. Resident has left to the hospital to chandler regional at 12:45 pm.” - “12/09/2025 - Talked to staff at Tempe Post Acute. They mentioned this resident is unable to stand and using a hoyer lift. I (E1) told them that is out of our scope.” 3. In an interview, E1 reported R2’s hospice provider was called and the facility was given instructions on what to do. E1 reported that after R2’s visit to the hospital R2 was admitted into rehab. E1 reported R2 required a hoyer lift and that R2 is now out of the facility’s scope of services and will not be able to return to the facility. E1 acknowledged R2 was in pain before being sent to the hospital. 4. In an exit interview, the findings were reviewed with E1, and no additional information was provided.”
The home's plan of correction
Temporary Solution An immediate audit of all residents utilizing electric wheelchairs was completed. A review of current service plans was conducted to ensure transfer status, mobility needs, and equipment safety were accurately documented. Residents with recent falls, injuries, or changes in mobility were reviewed to ensure appropriate follow-up and escalation occurred. Name, title and/or Position of the Person Responsible Sandra O'Connell, ED Permanent Solution Revised Incident reporting requiring Wellness Director to follow up on all injury-related incident reports within 24 hours. Mandatory reassessment documentation for any resident reporting pain level 5 or higher. Safety inspections have been completed on all electric wheelchairs and scooters. Equipment will be re-evaluated immediately following any injury or fall involving an electric mobility device. Staff have been re-educated that hospice involvement does not replace the need for appropriate medical evaluation when a resident experiences an injury or significant change in condition. Date temporary correction was complete 2025-11-13 Monitoring The Wellness Director will conduct random audits of five resident charts per week for 60 days to ensure proper documentation of follow-up and monitoring after incidents. Date permanent correction will be complete 2026-01-20
“Based on documentation review and interview, the manager failed to immediately report suspected exploitation according to A.R.S. § 46-454. The deficient practice posed a risk as a peace officer or the adult protective services (APS) central intake was unable to assess if there was an immediate health and safety concern for the resident and other residents residing in the assisted living facility. Findings include: 1. A.R.S. § 46-454(A) stated "A. A health professional, emergency medical technician, home health provider, hospital intern or resident, speech, physical or occupational therapist, long-term care provider, social worker, peace officer, medical examiner, guardian, conservator, fire protection personnel, developmental disabilities provider, employee of the department of economic security or other person who has responsibility for the care of a vulnerable adult and who has a reasonable basis to believe that abuse, neglect or exploitation of the adult has occurred shall immediately report or cause reports to be made of such reasonable basis to a peace officer or to the adult protective services central intake unit. The guardian or conservator of a vulnerable adult shall immediately report or cause reports to be made of such reasonable basis to the superior court and the adult protective services central intake unit. All of the above reports shall be made immediately by telephone or online..." 2. R9-10-101.111 stated "Immediate" means without delay. 3. Review of E1’s text messages showed R3’s family member contacted E1 on November 26, 2025 at 3:49 pm which stated, “Call me, one of your employees stole my [R3’s] credit card and went to town. There’s an active investigation.” 4. Review of the facility’s email, provided by E1, revealed an email with the sent date November 27, 2025 at 11:12 AM, which stated, “Thank you for contacting Adult protective services on 11/27/2025”. 5. In an interview, E1 acknowledged R3’s family member contacted E1 on November 26, 2025 and APS was contacted on November 27, 2025. 6. In an exit interview, the findings were reviewed with E1, and no additional information was provided.”
The home's plan of correction
Temporary Solution Mandated reporting requirements under A.R.S. § 46‑454 were fulfilled as necessary, including APS and/or law enforcement contact. The manager held a staff huddle to re-educate involved staff on immediate necessary actions when exploitation is suspected. Name, title and/or Position of the Person Responsible Sandra O'Connell, ED Permanent Solution The Abuse, Neglect, and Exploitation Policy was reviewed to outline, all elements of R9‑10‑803(J)(1–6), including: Immediate protective actions; mandatory reporting procedures; documentation requirements; investigation timelines and record retention requirements. It was noted that although the APS online report was started on 11/26/2025, the submission acknowledgement was not received until the following morning. which made the submission not considered "immediate". Date temporary correction was complete 2025-11-27 Monitoring The ED and Wellness Director will follow up on every report of any suspicious activity and immediately report to the proper authorities and suspicion of exploitation. All Incident Reports will be reviewed on a weekly basis. Date permanent correction will be complete 2025-12-09
“Based on record review and interview, the manager failed to ensure a written service plan included documentation of the resident's medical or health problems, including physical, behavioral, cognitive, or functional conditions or impairments, for three of the three residents sampled. The deficient practice posed a risk if medical or health problems were not addressed by the assisted living facility. Findings include: 1. Review of R1’s current service plan dated October 2025 did not include a list of R1's medical or health problems, including physical, behavioral, cognitive, or functional conditions or impairments. 2. Review of R2’s current service plan dated October 2025 did not include a list of R2’s medical or health problems, including physical, behavioral, cognitive, or functional conditions or impairments. 3. Review of R3’s current service plan dated October 2025 did not include a list of R3's medical or health problems, including physical, behavioral, cognitive, or functional conditions or impairments. 4. In an interview, E1 acknowledged the current service plans provided did not include a list of R1’s, R2’s, and R3’s medical or health problems, including physical, behavioral, cognitive, or functional conditions or impairments. 5. In an exit interview, the findings were reviewed with E1, and no additional information was provided.”
The home's plan of correction
Temporary Solution The service plans for R1, R2, and R3 were immediately reviewed and updated to include a comprehensive list of each resident’s medical and health problems, including physical, behavioral, cognitive, and functional conditions or impairments. Name, title and/or Position of the Person Responsible Sandra O'Connell, ED Permanent Solution The EMR service plan template has been revised to include a required section for medical and health problems, including physical, behavioral, cognitive, and functional impairments. The system has been adjusted (where applicable) to require completion of these fields prior to finalizing a service plan. Date temporary correction was complete 2025-12-12 Monitoring The Executive Director will audit five (5) service plans weekly for 60 days to ensure inclusion of all required medical and health conditions. Findings will be reviewed in Quality Assurance meetings. Date permanent correction will be complete 2025-12-31
2025-11-20Complaint InvestigationNo findings
Plain-language summary
No deficiencies were found during the on-site investigation of complaints 00149830 and 00147438 conducted on November 20, 2025.
2025-11-03Complaint InvestigationNo findings
Plain-language summary
No deficiencies were found during the on-site investigation of complaint 00147575 conducted on November 3, 2025.
2025-10-01Complaint InvestigationNo findings
Plain-language summary
No deficiencies were found during the on-site investigation of complaints 00141445 and 00138160 conducted on October 1, 2025.
2025-09-26Complaint InvestigationNo findings
Plain-language summary
No deficiencies were found during the on-site investigation of complaints 00146117, 00144788, and 00144688 conducted on September 26, 2025.
2025-07-23Complaint Investigation1 finding
Plain-language summary
The following deficiencies were found during the on-site investigation of complaints 00136519, 00136462, and 00136171 conducted on July 23, 2025:
“Based on record review and interview, the manager failed to ensure that a medication administered to a resident was administered in compliance with a medication order, for one of two residents sampled. The deficient practice posed a risk if the resident experienced a change in condition due to improper administration of medication. Findings include: 1. A review of R2’s medical record revealed a medication order dated April 16, 2025, for Midodrine HCl 2.5 milligrams (mg), 1 tablet by mouth (po) twice a day (bid) if systolic blood pressure (SBP) is less than 105 millimeters of mercury (mmHg). 2. A review of R2’s medication administration record (MAR) for June 2025 and July 2025 revealed R2 was administered Midodrine HCl 2.5 mg, 1 tablet po on the following dates and times: June 24, 2025, at 8:00 AM; June 26, 2025, at 8:00 AM; June 29, 2025, at 8:00 AM and 6:00 PM; June 30, 2025, at 6:00 PM; July 6, 2025, - July 8, 2025, at 8:00 AM; July 9, 2025, at 6:00 PM; July 12, 2025, at 8:00 AM; July 14, 2025, at 6:00 PM; July 15, 2025, at 8:00 AM; July 19, 2025, at 8:00 AM; and July 20, 2025 - July 22, 2025 at 8:00 AM and 6:00 PM. 3. A review of R2's medical record revealed the following SBP readings: 156 / 63 mmHg on June 24, 2025, at 8:00 AM; 172 / 84 mmHg on June 26, 2025, at 8:00 AM; 167 / 70 mmHg on June 29, 2025, at 8:00 AM; 209 / 85 mmHg on June 29, 2025, at 6:00 PM; 144 / 82 mmHg on June 30, 2025, at 6:00 PM; No SBP reading was documented on July 6, 2025, at 8:00 AM; 193 / 69 mmHg on July 7, 2025, at 8:00 AM; 112 / 82 mmHg on July 8, 2025, at 8:00 AM; 165 / 61 mmHg on July 9, 2025, at 6:00 PM; 192 / 66 mmHg on July 12, 2025, at 8:00 AM; 165 / 79 mmHg on July 14, 2025, at 6:00 PM; 186 / 95 mmHg on July 15, 2025, at 8:00 AM; 195/80 mmHg on July 19, 2025, at 8:00 AM; 153 / 66 mmHg on July 20, 2025, at 8:00 AM; 180 / 66 mmHg on July 20, 2025, at 6:00 PM; 139 / 69 mmHg on July 21, 2025, at 8:00 AM; 150 / 86 mmHg on July 21, 2025, at 6:00 PM; 149 / 75 mmHg on July 22, 2025, at 8:00 AM; and 159 / 76 mmHg on July 22, 2025, at 6:00 PM. However, the aforementioned SBP readings did not indicate the administration of Midodrine HCl 2.5 mg to R2. 4. In an interview, the finding was reviewed with E1 and E2, and no additional information was provided.”
The home's plan of correction
Temporary Solution Upon identification of the deficiency, the medication order was reviewed, and the resident’s blood pressure medication administration was immediately brought into compliance with the physician’s orders. Care staff administered the correct medication, dose, and timing according to the order. The resident’s vital signs were monitored and documented as required. Name, title and/or Position of the Person Responsible Tatiana Houston, ALD, Interim Executive Director Permanent Solution All current medication orders for residents with blood pressure management have been reviewed to ensure compliance with physician orders. Care staff were re-educated on the importance of administering medications exactly as ordered, including proper dose, timing, and documentation requirements for blood pressure. Date temporary correction was complete 2025-07-23 Monitoring ALD to perform random audits of MAR and medication orders weekly for the next three months. Documentation of all audits to be retained and reviewed by the Quality Assurance Committee to ensure ongoing compliance. Ongoing audits and compliance checks will continue indefinitely as part of the facility’s Quality Assurance program. Date permanent correction will be complete 2025-10-08
2025-07-14Complaint Investigation1 finding
Plain-language summary
The following deficiency was found during an on-site investigation of complaints 00136416 and 00136364 conducted on July 14, 2025.
“Based on observation and interview, the manager failed to ensure heating and cooling systems maintained the assisted living facility at a temperature between 70°F and 84°F at all times, unless individually controlled by a resident. Findings include: 1. During the environmental inspection of the facility, the Compliance Officer observed a thermostat on the wall in the dining room area. The thermostat read 90°F. 2. In an interview, O1 acknowledged the facility's temperature was not maintained between 70°F and 84°F at all times.”
The home's plan of correction
Temporary Solution A walk through of the common areas within the facility was conducted and temperatures were adjusted to be within the acceptable range according to the applicable standards. Name, title and/or Position of the Person Responsible Sandra O'Connell, ED Permanent Solution Locking Thermostat Guards were purchased and installed throughout the community in common areas in order to prevent any unauthorized adjustments. One key is maintained in the Maintenance Department, and the other is kept in the office of the Executive Director. Temperatures are adjusted to be within applicable guidelines depending on the season and outdoor ambient temperatures. Date temporary correction was complete 2025-07-16 Monitoring Once the thermostats have been locked, they will only need to be adjusted seasonally, however monthly each unit will be audited to ensure that the covers are still intact and temperatures are appropriate. Date permanent correction will be complete 2025-12-09
2025-07-03Complaint InvestigationNo findings
Plain-language summary
No deficiencies were found during the on-site investigation of complaint 00135470 conducted on July 3, 2025.
2025-06-23Complaint Investigation4 findings
Plain-language summary
The following deficiencies were found during the on-site investigation of complaints 00133248, 00133249, 00133255, 00133372, 00133369, 00133380, 00133391, and 00134240 conducted on June 23, 2025:
“Based on documentation review, observation, and interview, the manager failed to ensure that there was a means of exiting the facility that controlled or alerted employees of the egress of a resident from the facility. The deficient practice posed a risk if the facility was unaware of the general or specific whereabouts of a resident. Findings include: 1. A review of Department documentation revealed the facility was licensed to provide directed care services. 2. During an environmental tour of the facility, the Compliance Officer observed the facility to have a secured memory care unit. However, the doors from the secured area to the facility’s outdoor patio did not contain a way to control or alert employees of the egress of a resident from the facility. 3. In an interview, E1 acknowledged that the facility provided directed care services, and did not contain a way to control or alert employees of the egress of a resident from the facility on all exits. This is an uncorrected deficiency from the compliance and complaint inspection conducted on May 15, 2025, and the complaint investigation conducted on June 3, 2025.”
The home's plan of correction
Temporary Solution Immediately after notification from the Compliance Officer of the deficiency, a temporary door safety alarm was attached to the egress door until we could schedule a permanent door repair. Name, title and/or Position of the Person Responsible Sandra O'Connell, ED Permanent Solution A permanent magnetic door locking system was added to the egress door that has an alarm that will sound when the door handle is pushed. Date temporary correction was complete 2025-06-23 Monitoring Staff is alerted by an alarm when the door is accessed. Also Med techs and Managers have an app on their cell phones that monitors the lock. Walking rounds are done several times a day and all egress doors are verified to be secured and alarmed. Date permanent correction will be complete 2025-11-19
“Based on observation and interview, the manager failed to ensure that a resident was treated with dignity, respect, and consideration. Findings include: 1. During an environmental tour of the facility, the Compliance Officer observed R5's face and clothing to be covered in an unknown substance, which appeared dried. 2. The Compliance Officer also observed urine and feces in, on, and around the toilet in R5's bathroom. 3. In an interview, R5 reported not feeling well and reported that the care staff had recently been in to check on R5. 4. In an interview, E1 acknowledged R5 was not treated with dignity, respect, and consideration. This is an uncorrected deficiency from the compliance and complaint inspection conducted on May 15, 2025.”
The home's plan of correction
Temporary Solution Staff was re-educated on Resident Rights and Dignity issues. Name, title and/or Position of the Person Responsible Sandra O'Connell, ED Permanent Solution All staff will receive continuing education on all aspects of Resident Rights and how to care for our residents with dignity and respect. All residents have been surveyed regarding their thoughts on care/dignity issues here. Date temporary correction was complete 2025-09-30 Monitoring There will be daily rounds by managers to ensure that residents are properly dressed and groomed. We will also continue to monitor resident satisfaction on a quarterly basis. Date permanent correction will be complete 2025-12-05
“Based on documentation review, observation, and interview, the manager failed to ensure that policies were implemented that ensure the safety of the resident who may wander. Findings include: 1. A review of the facility’s policies and procedures revealed a policy titled “Safety Measures Addressing Dementia-Specific Dangers.” The policy stated, “1. Wandering … Secure Environment: The facility will be designed to minimize the risk of wandering, with secured exits and monitored entrances to prevent residents from leaving the premises unsupervised. … Identification Systems: Residents at risk for wandering will wear identification bracelets or utilize tracking devices, allowing for prompt location if they wander.” 2. During an environmental tour of the facility, the Compliance Officer observed the facility to have a secured memory care unit. However, the doors from the secured area to the facility’s outdoor patio did not contain a way to control or alert employees of the egress of a resident from the facility. 3. The Compliance Officer also did not observe a tracking system in use at the time of inspection. 4. In an interview, E1 acknowledged that policies were not implemented to ensure the safety of a resident who may wander.”
The home's plan of correction
Temporary Solution An Elopement Drill was conducted in September for all staff members. In July we instituted head counts to be done randomly throughout the day. We also added a temporary door alarm on the egress door to the outside patio. Name, title and/or Position of the Person Responsible Sandra O'Connell, ED Permanent Solution The policy for Wandering and Elopement Risk Management Policy was revised to include having assessments performed of residents upon admission and reassessment will occur at least annually, with any significant change in condition, or immediately following any wandering or elopement incident. (Policy attached) A maglock with alarm was installed by Titan Alarm that will alert staff if someone tries to open the door. There is also an app that has been downloaded to the cell phones of the Med Techs and managers to ensure that the door lock is properly engaged. Date temporary correction was complete 2025-09-25 Monitoring Assessments will continue to be conducted and adjustments to environmental security will be made as needed. Date permanent correction will be complete 2025-12-01
“Based on observation and interview, the manager failed to ensure that the premises and equipment used at the assisted living facility were free from a condition or situation that may cause a resident or other individual to suffer physical injury. The deficient practice poses a health and safety risk to residents. Findings include: 1. During an environmental tour of the facility, the Compliance Officer observed that the facility had a secured memory care area, with ambulatory residents, which included an outdoor patio. However, the outdoor patio area's fence was raised off the paved ground, creating approximately a 10-inch gap between the fence and the ground. 2. The Compliance Officer also observed water to be leaking from the facility's sprinkler system into a trash can in the center of a second-floor hallway. However, the Compliance Officer observed a wheelchair-bound resident residing in the room adjacent to the leaking sprinkler. 3. In an interview, E1 acknowledged that the premises and equipment used at the facility were not free from a condition or situation that may cause a resident or other individual to suffer physical injury. This is an uncorrected deficiency from the compliance and complaint inspection conducted on May 15, 2025, and the complaint investigation conducted on June 3, 2025.”
The home's plan of correction
Temporary Solution Immediately after the Compliance Officer notifying E1of the issue with the outdoor patio, any residents wishing to access the outdoor patio area were to be accompanied by a staff member to ensure safety. Name, title and/or Position of the Person Responsible Sandra O'Connell, ED Permanent Solution An extension was added to the bottom of the outdoor fence above the paved walkway to prevent any gaps in security of the patio area. Date temporary correction was complete 2025-06-23 Monitoring Walking rounds of the grounds and building are conducted daily. Date permanent correction will be complete 2025-07-09
2025-06-03Complaint Investigation4 findings
Plain-language summary
The following deficiencies were found during the on-site investigation of complaints 00132297, 00132301, 00132523, 00132530, and 00132549 conducted on June 3, 2024:
“Based on documentation review, record review, and interview, the manager failed to immediately report suspected abuse according to A.R.S. § 46-454. The deficient practice posed a risk as a peace officer or the adult protective services central intake was unable to assess if there was an immediate health and safety concern for the resident and other residents residing in the assisted living facility. Findings include: 1. A.R.S. § 46-454(A) stated "A. A health professional, emergency medical technician, home health provider, hospital intern or resident, speech, physical or occupational therapist, long-term care provider, social worker, peace officer, medical examiner, guardian, conservator, fire protection personnel, developmental disabilities provider, employee of the department of economic security or other person who has responsibility for the care of a vulnerable adult and who has a reasonable basis to believe that abuse, neglect or exploitation of the adult has occurred shall immediately report or cause reports to be made of such reasonable basis to a peace officer or to the adult protective services central intake unit. The guardian or conservator of a vulnerable adult shall immediately report or cause reports to be made of such reasonable basis to the superior court and the adult protective services central intake unit. All of the above reports shall be made immediately by telephone or online..." 2. R9-10-101.110 stated "Immediate" means without delay. 3. Review of the facility’s policy and procedures titled, “Abuse, Neglect, and Exploitation” stated, “The act of alleged abuse, neglect or exploitation must be reported within the first 24 hours or the next business day, either written or orally, to the local long term care Ombudsman Program office and the appropriate state office which will investigate reports of alleged abuse, neglect and exploitation." 4. Review of facility documentation revealed a document titled "Incident Report” dated May 30, 2025. The incident took place on May 27, 2025, and stated, “[R2] said that without saying anything [R2] got up- from a third separate table and slapped [R3] in the face,”. The incident report did not include any documentation showing the incident was reported to a peace officer or to the adult protective services central intake unit. 5. In an interview, E1 acknowledged E1 did not report the incident to a peace officer or to the adult protective services central intake unit.”
The home's plan of correction
Temporary Solution ED and ALD held a training session at All- Staff meeting in the steps of reporting abuse, neglect, and misappropriation. Additionally, education on how to handle situations with appropriate measures with any Resident-to-Resident altercation. ED and ALD spoke with the son about better ways of communicating with his mom before and after going on vacation and handling her outburst and attention seeking behaviors in a manner that does not create more stress for her resulting in the need to create situations that put her at risk as well as other residents. Name, title and/or Position of the Person Responsible Elisabeth George, ED Permanent Solution All reports generated by a resident or staff with regard to abuse, neglect, or misappropriation will be and has been reported to APS, Law Enforcement, and DHS, even if the witnesses state the situation never occurred and if the accuser admits they fabricated the information. As such, the ED and ALD will ensure the reports are generated to the appropriate authorities. New allegations that occurred after this incident have been reported to APS, DHS, Law Enforcement, and the Ombudsman. All staff have also been instructed to report on all situations of any resident making a statement about being abused or neglected, and to report it to the ALD and/or ED immediately. The ALD and ED will follow up with appropriate reporting and investigation process. Date temporary correction was complete 2025-06-05 Monitoring Random Audits of all Reports and Investigations that have an allegation of Abuse, Neglect, or Misappropriation will be reviewed in the Quality Management Meeting with the management staff with the Executive Director, Assisted Living Director and designee(s). Date permanent correction will be complete 2025-06-06
“Based on documentation review, observation and interview, the manager failed to ensure there was a means of exiting the facility for a resident who does not have a key, special knowledge for egress, or the ability to expend increased physical effort that provided access to an outside area from which a resident may exit to a location at least 30 feet away from the facility and controlled or alerted employees of the egress of a resident from the facility. The deficient practice posed a risk if the facility was unaware of the general or specific whereabouts of a resident. Findings include: 1. Review of the license issued by the Department revealed the facility was authorized to provide directed care services. 2. Review of the facility policy and procedures, which did not have a title, stated, “4. Door Alarms and Monitoring Devices: All door alarms and monitoring devices must be fully operational and regularly maintained. Staff should follow established protocols for their use and maintenance to ensure they are effectively supporting resident safety.” 3. The Compliance Officers observed ambulatory residents in the facility. 4. The Compliance Officers observed a door leading to an outside area from the memory care unit. The door did have an alert system on it; however, when the door was opened, a chime did not sound to alert employees to the egress. The Compliance Officers were able to open the door without a key or special knowledge and observed two residents walking back into the facility from the outside area. 5. In an interview, E1 acknowledged the alarms on the door were turned off. E1 acknowledged there was a means of exiting the facility to an outside area which did not control or alert employees of the egress of a resident from the facility. 6. This is an uncorrected deficiency from the inspection conducted on May 15-16, 2025.”
The home's plan of correction
Temporary Solution Random Checks have been and continue to be conducted by different management members of the Memory Care Courtyard doors to ensure the temporary alarm is on and working correctly. Multiple door companies have been contacted to request estimates for repairs to submit to the Corporate Office for Capital Expense approval to fix the egress doors on the Memory Care Courtyard. Name, title and/or Position of the Person Responsible Elisabeth George, ED Permanent Solution A new temporary alarm was installed that alerts staff of anyone exiting the building. In addition, a permanent alarm system that is like the other Memory Care egress doors will be installed with a locking mechanism and alarm system to alarm staff of anyone exiting the interior building to the secured courtyard and prevent anyone of exiting this door that is not accompanied by a staff member with the fob/code. Date temporary correction was complete 2025-06-03 Monitoring The audit of the door alarm will be handed in at the Quality Management Meeting for review by the Executive Director, Assisted Living Director, and Business Director and/or Designee(s) to ensure staff are aware of when the egress Memory Care Door alarms and to keep this door always secured. Date permanent correction will be complete 2025-06-04
“Based on observation, interview, and documentation review, the manager failed to ensure the premises were free from a condition or situation that may cause a resident or other individual to suffer physical injury. The deficient practice posed potential dangers to residents. Findings include: 1. The Compliance Officers observed R6’s bedroom. R6's closet door was hanging off the hinges. 2. In an interview, R6 reported R6’s closet door has been hanging off one of the hinges for a week. 3. The Compliance Officers observed a video that was sent to the department. The video showed flooding from R1’s room to the facility hallway. In the hallway, there was only a mop bucket and no wet floor sign. 4. In an electronic interview, O2 reported, in regards to the overflowing toilet, "The water continued all night and staff attempted to manage it until the following day. By that time water entered multiple rooms." 5. In an interview, E1 acknowledged the premises were not free from a condition or situation that may cause a resident or other individual to suffer physical injury.”
The home's plan of correction
Temporary Solution In the All-Staff meeting, all staff members were instructed on how to turn off the water from any overflowing toilet due to a clog. In addition, all staff were instructed on how to report items on the maintenance log for a resident apartment or common space that needs fixed or repaired. Maintenance was also educated on the importance of completing maintenance requests in a timely manner. Name, title and/or Position of the Person Responsible Elisabeth George, ED Permanent Solution Maintenance logs will be reviewed regularly to ensure that maintenance items are being handled in a timely manner. In addition, the maintenance logs will be handed in at the Quality Management Meeting for review by the Assisted Living Manager and/or Designee to ensure all maintenance items are being attended properly and in a timely manner. Date temporary correction was complete 2025-06-05 Monitoring The audit of the maintenance logs will be handed in at the Quality Management Meeting for review by the Executive Director, Assisted Living Director, and Business Director and/or Designee(s) to ensure maintenance items are being attended to properly and in a timely manner. Date permanent correction will be complete 2025-06-06
“Based on documentation review, record review, and interview, the manager failed to ensure current documentation of first aid and cardiopulmonary resuscitation (CPR) training certification specific to adults was maintained for one of two employees sampled. The deficient practice posed a risk if an employee was unable to meet a resident's needs during an emergency, and the department was provided false or misleading documentation. Findings include: 1. A review of the facility's policies and procedures revealed a policy titled “CPR Certification Policy.” The policy stated, “CPR Certification Policy … Applies to: All Direct Care Staff, Managers, and Emergency Response Personnel … Purpose… To ensure the safety and well-being of all residents by requiring staff to be trained and certified in Cardiopulmonary Resuscitation (CPR). Policy Statement … All employees providing direct care, supervision, or emergency response must maintain current CPR certification from a program that includes an in-person skills demonstration and is issued by an ADHS-recognized provider (e.g., American Red Cross, American Heart Association).” 2. A review of E1's personnel record revealed a hire date of March 21, 2025, as the Assisted Living Manager. 3. During an on-site inspection conducted on May 15-16, 2025, the department was provided with E1's personnel record, which revealed that the CPR and First Aid certification had a class completion date of May 3, 2023, and an expiration date of May 3, 2025. 4. A review of E1's personnel record revealed the same First Aid and CPR card with a class completion date of May 23, 2025, and an expiration date of May 23, 2027. However, the Compliance Officers observed that the card had been altered. The original card stated "class completion date 5/3/2023" and "expiration date 5/3/2025," but the dates had been written over and changed to "05/23/2025" and "05/23/2027." A zero and a two were added, and the digits three and five in "2023" and "2025" appeared to have been overwritten to make them look like a five and a seven. There was no other current documentation of First Aid and CPR training in E1’s personnel record. 5. In a telephonic interview, O1 reported that the CPR and First Aid certification in E1's personnel record, with an expiration date of May 3, 2025, was accurate and had been issued by O1 during E1's employment at another facility. O1 reported that no other CPR and First Aid certification was issued to E1 and reported that the expiration date of May 23, 2027, was false and not provided by O1. O1 also stated that they do not issue CPR and First Aid certifications for Solterra Senior Living. 6. In an interview, E1 acknowledged not having current documentation of First Aid and CPR training and acknowledged the card had been altered. 7. This is an uncorrected deficiency from the inspection conducted on May 15-16, 2025.”
The home's plan of correction
Temporary Solution E1 promptly set up to attend another CPR class where digital confirmation is sent with a digital CPR card to ensure that there is not an instance where any discrepancies of altercation could occur again. Digital CPR recertification was received and is current in the E1 file. Name, title and/or Position of the Person Responsible Elisabeth George, ED Permanent Solution All staff with expiring CPR cards will be required to attend a CPR class that provides the digital signature and email confirmation of CPR renewals. In addition, the business office has created a tracker audit that will be reviewed regularly by management team members to track all CPR recertification needed. Date temporary correction was complete 2025-06-11 Monitoring The employee tracker audit will be handed in at the Quality Management Meeting for review by the Executive Director, Assisted Living Director, and Business Director and/or Designee(s) to ensure staff are aware of when CPR cards are about to expire and where to attend a CPR class with digital confirmations. Date permanent correction will be complete 2025-08-04
2025-05-15Complaint Investigation23 findings
Plain-language summary
The following deficiencies were found during the on-site compliance inspection and investigation of complaints 00104188, 00130993, and 00122404 conducted on May 15, 2025, and May 16, 2025:
“Based on record review and interview, the manager failed to ensure identification of the patient's need for the opioid before the opioid was administered or assistance in the self-administration of medication for a prescribed opioid was provided for two of the nine residents sampled. Findings include: 1. In a record review, R4's medication administration record (MAR) included Hydrocodone/APAP 5-325 MG, 1 tab by mouth, every six hours as needed. Documentation showed Hydrocodone was administered on the 1st-16th, 18th-20th, 22nd-23rd, and the 25th-30th of April. However, the MAR did not show documentation of the patient's need for the opioid before the opioid was administered. The patient's response to Hydrocodone/APAP was documented. 2. In an interview, E2 acknowledged there was no documentation for R4's need for the opioid before the opioid was administered, or assistance in the self-administration of medication for a prescribed opioid.”
The home's plan of correction
Temporary Solution The resident involved was immediately assessed for pain. The provider was notified, and no adverse outcomes were identified. Care staff received direct re-education on proper opioid administration protocols, including documentation of pain assessments before administration. Name, title and/or Position of the Person Responsible Tatiana Houston, ALD, Interim Executive Director Permanent Solution All staff will receive mandatory opioid administration and documentation training, covering: Pain assessment tools and proper documentation, verification of clinical need before administration, post-administration reassessment and documentation. Date temporary correction was complete 2025-05-23 Monitoring The ALD and RCCs will conduct weekly audits for 3 months of all opioid administrations to ensure: Pain assessments are documented before administration, and effectiveness and follow-up assessments are completed after administration. Findings will be reviewed in Quality Assurance and Performance Improvement (QAPI) meetings, with corrective action plans updated as needed. Staff who fail to comply will undergo immediate retraining and progressive disciplinary action if necessary. Date permanent correction will be complete 2025-07-31
“Based on documentation review, record review and interview, the governing authority failed to ensure compliance with A.R.S. § 36-411, for five of ten personnel sampled. The deficient practice posed a risk if E1, E4, E8, E9, and E10 were a danger to a vulnerable population. Findings include: 1. A.R.S. § 36-411(C) states, "Each residential care institution, nursing care institution and home health agency shall make documented, good faith efforts to: 1. Contact previous employers to obtain information or recommendations that may be relevant to a person’s fitness to work in a residential care institution, nursing care institution or home health agency. 2. Verify the current status of a person's fingerprint clearance card." 2. A review of E1's personnel record revealed documentation of a valid fingerprint clearance card (FPCC). However, the status of E1's FPCC was not verified as required. 3. A review of E4's personnel record revealed documentation of professional references, however, documentation of the facility's good faith effort to contact previous employers was not available. 4. A review of the E8's personnel record revealed documentation of a valid fingerprint clearance card (FPCC). However, the status of E8's FPCC was not verified as required. 5. A review of E8's personnel record revealed documentation of professional references, however, documentation of the facility's good faith effort to contact previous employers was not available. 6. A review of the E9's personnel record revealed documentation of a valid fingerprint clearance card (FPCC). However, the status of E9's FPCC was not verified as required. 7. A review of E9's personnel record revealed documentation of professional references, however, documentation of the facility's good faith effort to contact previous employers was not available. 8. A review of E10's personnel record revealed documentation of professional references, however, documentation of the facility's good faith effort to contact previous employers was not available. 9. In an interview, E1 acknowledged the facility did not ensure compliance with A.R.S. § 36-411. This is a repeat deficiency from the compliance inspection conducted on May 4-5, 2022.”
The home's plan of correction
Temporary Solution Conducted a full audit of all employees' personnel file to identify who currently lacks a valid FPCC or whose status is not documented. Verified current FPCC status of all employees who had cards, ensuring they are not expired, suspended, revoked, or otherwise invalid. This audit includes calling professional and personal references. Name, title and/or Position of the Person Responsible Tatiana Houston, ALD, Interim Executive Director Permanent Solution Maintain a tracking log showing for each relevant person: date of hire or start; date FPCC expired; date FPCC received; FPCC status; HR and front desk is to update this log regularly. Reference sheets were created and included in new hire orientation. Personal file checklist has been created for all new employee files moving forward to ensure compliance in ARS 36-411. Date temporary correction was complete 2025-06-30 Monitoring HR Manager will conduct internal audits of staffing files for a period of at least 6 months to ensure all required FPCC validations are in place and current, as well as references. The results of the audits will be reviewed at monthly Quality meetings and documented. Date permanent correction will be complete 2025-08-08
“Based on record review, documentation review, and interview, the manager failed to ensure that before providing assisted living services to a resident, a caregiver provided current documentation of first aid training and cardiopulmonary resuscitation (CPR) training specific to adults, for two of ten personnel records sampled. The deficient practice posed a risk if an employee was unable to meet a resident's needs during an emergency. Findings include: 1. A review of E1's personnel record revealed a CPR and First Aid certification with an expiration date of May 3, 2025. 2. A review of E6's personnel record revealed a CPR and First Aid certification with an expiration date of March 21, 2025. 3. A review of the facility's personnel schedules for March 2025, April 2025, and May 2025 revealed E6 was scheduled to work and provide services in the facility on the following dates: March 24, 2025, from 6:00 AM - 10:00 PM; April 1, 2025- April 2, 2025 from 6:00 AM - 10:00 PM; April 8, 2025 - April 9, 2025 from 6:00 AM - 10:00 PM; April 29, 2025 - April 30, 2025 from 6:00 AM - 10:00 PM; May 5, 2025 - May 6, 2025 from 6:00 AM - 10:00 PM; and May 12, 2025 - May 13, 2025 from 6:00 AM - 10:00 PM. 4. In an interview, E1 acknowledged E1's and E6's personnel records did not contain documentation of a current CPR and first aid training certification. This is a repeat citation from the compliance and complaint inspection conducted on May 18, 2023.”
The home's plan of correction
Temporary Solution Employees with expired CPR/First Aid cards were immediately removed from the schedule until certification was renewed. Employees were enrolled in a CPR/First Aid class and certification was updated. Documentation of completed training and updated cards has been placed in each employee’s personnel file. Name, title and/or Position of the Person Responsible Tatiana Houston, ALD, Interim Executive Director Permanent Solution A tracking system has been implemented to monitor expiration dates of all CPR/First Aid certifications. Staff will receive reminder notifications at least 60 days prior to card expiration. Employees will not be scheduled if CPR/First Aid certification is expired. Date temporary correction was complete 2025-05-16 Monitoring Human Resources (HR) Manager will regularly audit personnel files to ensure CPR/First Aid certification is current. Results of audits will be reviewed during Quality Assurance and Performance Improvement (QAPI) meetings. Date permanent correction will be complete 2025-07-30
“Based on record review and interview, the manager failed to ensure that a caregiver received orientation that was specific to the duties to be performed by the caregiver before providing assisted services to a resident, for three of ten personnel sampled. The deficient practice posed a risk if the employees were unable to meet residents’ needs. Findings include: 1. A review of E8's personnel record did not include documentation of E8's completed orientation. Based on E8's date of hire, this documentation was required. 2. A review of E9's personnel record did not include documentation of E9's completed orientation. Based on E9's date of hire, this documentation was required. 3. A review of E10's personnel record did not include documentation of E10's completed orientation. Based on E10's date of hire, this documentation was required. 4. In an interview, E1 reported that E8, E9, and E10 are current employees and have begun providing services to residents. E1 acknowledged E8, E9, and E10 did not receive orientation that was specific to the duties to be performed by the E8, E9, and E10 before providing assisted services to a resident.”
The home's plan of correction
Temporary Solution All caregivers and staff who had begun working without completing orientation have now received immediate orientation that was specific to the duties to be performed. Documentation of completed orientation has been placed in each employee’s personnel file. Name, title and/or Position of the Person Responsible Tatiana Houston, ALD, Interim Executive Director Permanent Solution New hire orientation was implemented and must be completed and documented before any staff member starts their scheduled shift. New hire checklist was created and updated to ensure orientation completion before assignment. Human Resources (HR) Manager will verify completion of orientation prior to staff work. Date temporary correction was complete 2025-05-30 Monitoring Human Resources (HR) Manager track completion on tracking excel and will audit personnel files to ensure compliance. Results of audits will be reviewed at Quality Assurance and Performance Improvement (QAPI) meetings. Date permanent correction will be complete 2025-07-21
“Based on record review and interview, the manager failed to ensure that a resident provided evidence of freedom from infectious tuberculosis (TB) as specified in R9-10-113 for one of 11 residents sampled. The deficient practice posed a TB exposure risk to residents. 1. A review of R1's medical record revealed no evidence of documentation of a negative TB skin test or blood test. 3. In an interview, E1 acknowledged that R1's medical record did not include documentation of freedom from infectious tuberculosis before or within seven calendar days after the resident's date of occupancy, as specified in R9-10-113.”
The home's plan of correction
Temporary Solution All current residents whose TB documentation was missing were immediately screened for tuberculosis or evidence of TB freedom obtained. TB screening results were documented in each resident’s file. Residents with incomplete records were contacted, and necessary testing or physician documentation was obtained. Name, title and/or Position of the Person Responsible Tatiana Houston, ALD, Interim Executive Director Permanent Solution The admissions process has been updated to require that evidence of freedom from infectious TB is obtained before or within seven calendar days of occupancy. Education provided to all admissions and clinical staff on updated TB documentation requirements. Date temporary correction was complete 2025-05-21 Monitoring The ALD will review all new admissions weekly to ensure TB documentation is complete within the 7-day window. Monthly audits will be conducted by the Quality Assurance Committee to ensure compliance. Date permanent correction will be complete 2025-07-14
“Based on record review and interview, the manager failed to ensure the caregiver documented the services provided in the resident's medical record for one of 11 residents reviewed. The deficient practice posed a risk as services could not be verified as provided against a service plan. Findings include: 1. A review of R5's medical record revealed no activities of daily living (ADL) documentation. E11 reported that R5 was provided the services per R5's service plan. 2. In an interview, E1 acknowledged R5's medical record did not have ADL documentation for the services provided.”
The home's plan of correction
Temporary Solution A chart audit was completed immediately to identify all residents whose ADL documentation was incomplete. Nursing staff updated the medical records to accurately reflect all ADL services provided (e.g., bathing, grooming, dressing, feeding, toileting, mobility). Name, title and/or Position of the Person Responsible Tatiana Houston, ALD, Interim Executive Director Permanent Solution Implemented a daily ADL documentation in our EHR system for all nursing staff to complete during each shift. Updated staff training to reinforce the importance of accurate and timely ADL documentation in the electronic health record. Staff who fail to document ADLs as required will receive coaching or retraining. Date temporary correction was complete 2025-05-23 Monitoring The RCCs will review medical records weekly to verify ADL documentation compliance. Monthly reports on ADL documentation will be presented to the Quality Assurance and Performance Improvement (QAPI) Committee. Date permanent correction will be complete 2025-07-22
“Based on record review and interview, the manager failed to ensure that the service plan for a resident receiving directed care services included the resident's weight. Findings Include: 1. A record review of R2's medical record revealed a service plan dated May 12th, 2025, with no documentation of R2's weight. Further review listed R2's level of care as directed. 2. R2's medical record did not contain documentation from a medical practitioner stating that weighing R2 was contraindicated. 3. In an interview, E1 acknowledged R2 had a service plan without documentation of R2's weight or documentation from a medical practitioner stating that weighing R2 was contraindicated.”
The home's plan of correction
Temporary Solution The resident’s weight was obtained and documented. The resident’s service plan was immediately updated to include the current weight. A full audit of all current resident service plans was conducted to ensure each included the most recent weight. Name, title and/or Position of the Person Responsible Tatiana Houston, ALD, Interim Executive Director Permanent Solution A new Service Plan Checklist has been developed and implemented. The electronic health record (EHR) documentation forms have been updated to include weight. Date temporary correction was complete 2025-05-20 Monitoring ALD will audit service plans monthly to ensure all required components, including weight, are present and current. Results of audits will be reported to the Quality Assurance and Performance Improvement (QAPI) Committee. Date permanent correction will be complete 2025-08-06
“Based on record review, documentation review, and interview, the manager failed to ensure medication was administered to a resident in compliance with a medication order. Findings Include: 1. A record review of R10's medication administration record revealed Fexofenadine 180 mg 1 tablet daily being administered. However, Fexofenadine was not listed on the medication order. 2. In an interview, E1 acknowledged that R10's medication administration did not comply with the medication order. This is a repeat deficiency from the complaint investigations conducted on March 27, 2024, and January 10, 2024.”
The home's plan of correction
Temporary Solution The resident’s medication administration record (MAR) was immediately reviewed. The physician was notified of the incident. A full medication reconciliation was completed. No adverse effects were observed or reported for the resident. Name, title and/or Position of the Person Responsible Tatiana Houston, ALD, Interim Executive Director Permanent Solution A tracking system for medication recap signatures by the provider was created. The ALD will get orders signed by the provider on all the residents every 3months. The tracking system will ensure that. Date temporary correction was complete 2025-05-16 Monitoring A monthly chart review will be conducted by the ALD to ensure medication orders are transcribed and followed correctly. Track audit results and provide monthly reports to the Quality Assurance and Performance Improvement (QAPI) committee. Date permanent correction will be complete 2025-07-15
“Based on observation and interview, the manager failed to ensure medication was stored in a separate locked room, closet, cabinet, or self-contained unit used only for medication storage. Findings Include: 1. During an environmental inspection of R2's room, the Compliance Officers observed prescribed medication such as Ammonium Lactate Lotion and Ketoconazole Shampoo. 2. During an environmental inspection of R3's room, the Compliance Officers observed TUMS on the nightstand. 3. During an environmental inspection of R7's room, the Compliance Officers observed Nicotine Gum on a side table. 4. During an environmental inspection of the memory care unit, the Compliance Officers observed Thera Body Shield, TUMS, and Athlete's Foot Powder. 5. In an interview, E1 acknowledged that medication was not stored in a separate locked room, closet, cabinet, or self-contained unit used only for medication storage for R2, R3, and R7.”
The home's plan of correction
Temporary Solution Medications that were not properly secured were immediately relocated to the appropriate locked storage unit. Items located during the deficiency were identified was immediately secured to prevent unauthorized access. The staff involved in the incident were reminded of proper storage protocols and the importance of securing medications at all times Name, title and/or Position of the Person Responsible Tatiana Houston, ALD, Interim Executive Director Permanent Solution Locked cabinets have been installed in the rooms of memory care to ensure proper storage of potential harmful items. All nursing and clinical staff will undergo training on: Proper medication storage requirements, Importance of securing medications in a locked, designated area at all times, Procedures for reporting any issues or concerns related to medication storage. Date temporary correction was complete 2025-05-19 Monitoring Random checks will be conducted by the RCCs to ensure compliance. The ALD will oversee the implementation and monitoring of these corrective actions. Monthly audit results will be submitted to the Quality Assurance and Performance Improvement (QAPI) committee. Date permanent correction will be complete 2025-07-01
“Based on observation and interview, the manager failed to ensure that the premises and equipment used at the facility were free from conditions or situations that may cause a resident or other individual to suffer physical injury. Findings Include: 1. During an environmental inspection of the courtyard, the Compliance Officers observed a hose lying on the walkway. 2. During an environmental inspection of R1's room, the Compliance Officers observed half-bed rails on either side of R1's bed. 3. In an interview, E11 reported that R1 was not able to lower the bed rails on their own. 4. In an interview, E1 acknowledged that the premises at the facility are not free from conditions or situations that may cause a resident or other individual to suffer physical injury.”
The home's plan of correction
Temporary Solution Any patients who had bed rails were immediately assessed. Bed rails were removed, and alternative safety measures were provided. Water hose was removed and stored properly. Name, title and/or Position of the Person Responsible Tatiana Houston, ALD, Interim Executive Director Permanent Solution All relevant staff (nurses, care aides, and maintenance personnel) were immediately informed of the deficiency and reminded of proper bed rail and environmental safety procedures. This education will also be presented annually. Date temporary correction was complete 2025-05-16 Monitoring The facility Director will conduct weekly audits in the courtyard to ensure safety compliance. The ALD and RCCs will conduct random room audits for bed rails ensure compliance. Results of these audits will be discussed in QAPI. Date permanent correction will be complete 2025-07-28
“Based on observation, record review, and interview, the manager failed to ensure that pets or animals allowed in the facility had documentation of vaccination against rabies and were licensed. 1. During an environmental inspection of a resident's room, the Compliance Officers observed a cat lying on the bed. 2. A review of the facility's records revealed no documentation of vaccinations or a pet license. 3. In an interview, E1 acknowledged that they did not have documentation showing that the cat was licensed or had their vaccinations. This is a repeat deficiency from the compliance and complaint inspection conducted on May 18, 2023.”
The home's plan of correction
Temporary Solution Immediate review of all pet vaccination records was conducted. Any pets whose vaccination status was found to be incomplete or outdated were scheduled for necessary vaccinations. Until vaccination statuses were confirmed, any pets that could not provide vaccination documentation were temporarily restricted from the facility. Families were informed of the need for up-to-date vaccination records for any pets brought into the facility. Name, title and/or Position of the Person Responsible Tatiana Houston, ALD, Interim Executive Director Permanent Solution A centralized system was established to monitor the vaccination status of all pets within the facility. Any new pets entering the facility, whether resident or therapy animals, will be required to undergo a vaccination screening and provide proof of vaccinations before being allowed into the facility. Date temporary correction was complete 2025-05-16 Monitoring HR will review all pet vaccination records quarterly to ensure compliance with the updated policies. QAPI will conduct quarterly reviews of this audit for pet vaccination records to verify compliance. Date permanent correction will be complete 2025-08-11
“Based on observation and interview, the manager failed to ensure ventilation was provided in the residents' bathrooms for ten out of ten residents sampled. Findings Include: 1. During an environmental inspection of the residents' bathrooms, the Compliance Officers tried to turn on the ventilation. However, the air ventilation switch did not turn on the ventilation. Tested by putting a sheet of paper to the vent, but there was no air flow. 2. In an interview, E1 acknowledged that ventilation was not provided in the residents' bathrooms for the residents sampled.”
The home's plan of correction
Temporary Solution Staff were immediately informed of the importance of maintaining bathroom cleanliness and moisture control. Additional cleaning protocols for bathrooms with high humidity or moisture were implemented. A thorough inspection of all bathrooms was conducted to assess the full extent of the deficiency. Name, title and/or Position of the Person Responsible Tatiana Houston, ALD, Interim Executive Director Permanent Solution A licensed HVAC contractor has been hired to conduct a full assessment of all bathrooms to determine the necessary upgrades or installations for proper ventilation. Exhaust fans will be installed and/or replaced in all bathrooms that do not currently have one. The installation will meet both state building codes and health department guidelines for air circulation in wet areas. Once the new systems are installed, regular checks will be conducted by maintenance staff to ensure that all ventilation systems are functioning properly. Date temporary correction was complete 2025-07-31 Monitoring The Facility Director will audit cleaning schedules for bathrooms to include additional checks for moisture buildup and mildew prevention. The facility’s Director will oversee the installation process of ventilation systems, ensuring all work is completed as scheduled. Weekly progress reports will be submitted to the QAPI team. A monthly audit will be performed by the facility’s quality assurance team to check ventilation systems, monitor humidity levels, and verify cleanliness standards in all bathrooms. Date permanent correction will be complete 2025-12-31
“Based on documentation review, record review, and interview, the health care institution failed to ensure the health care institution developed and administered a training program for all staff regarding fall prevention and fall recovery that included initial training and continued competency training for six of ten personnel sampled. The deficient practice posed a health and safety risk for residents. Findings include: 1. A review of the facility's policies and procedures revealed a policy titled, "Fall Prevention Policy." However, the policy did not include documentation of an established training program for all staff regarding fall prevention and fall recovery. 2. A review of E1’s personnel record did not include documentation of completed initial training on fall prevention and fall recovery. Based on E1's date of hire, this documentation was required. 3. A review of E2’s personnel record did not include documentation of completed initial training on fall prevention and fall recovery. Based on E2's date of hire, this documentation was required. 4. A review of E6’s personnel record revealed documentation of completed initial training on fall prevention and fall recovery on May 27, 2023. However, E6's record did not include documentation of continued competency training. 5. A review of E8’s personnel record did not include documentation of completed initial training on fall prevention and fall recovery. Based on E8's date of hire, this documentation was required. 6. A review of E9’s personnel record did not include documentation of completed initial training on fall prevention and fall recovery. Based on E9's date of hire, this documentation was required. 7. A review of E10’s personnel record did not include documentation of completed initial training on fall prevention and fall recovery. Based on E10's date of hire, this documentation was required. 8. In an interview, E1 acknowledged the facility failed to develop and administer a training program for all staff regarding fall prevention and fall recovery that included initial and continued competency training. This is a repeat deficiency from the complaint investigation conducted on September 20, 2022.”
The home's plan of correction
Temporary Solution Immediately staff huddles were conducted to review fall prevention and recovery protocols with all staff. Audits on employee files were conducted. Name, title and/or Position of the Person Responsible Tatiana Houston, ALD, Interim Executive Director Permanent Solution A Fall Prevention and Recovery Training Program has been developed and implemented for all staff. Training covers but not limited to: risk factors, safe transfer techniques, mobility aid usage, and post-fall response, etc. Training is included in new employee orientation and annual mandatory in-services. Competency checks (return demonstrations) are completed by staff after training. All employee files were reviewed and updated. Date temporary correction was complete 2025-06-05 Monitoring A Fall Prevention Committee held by the ALD was established to review incidents monthly, identify trends, and recommend improvements. Staff tracking audit has been created and will be reviewed weekly by HR. Random audits of all employee files and the tracking excel form will be reviewed in the Quality Management Meeting with all Management staff. Date permanent correction will be complete 2025-07-31
“Based on record review and interview, the health care institution's chief administrative officer failed to ensure training and education related to recognizing the signs and symptoms of tuberculosis (TB) was provided annually to individuals employed by the health care institution, for six of ten personnel sampled. The deficient practice posed a potential illness risk to residents. Findings include: 1. A review of E1's personnel record did not include documentation of completed training on recognizing the signs and symptoms of TB. Based on E1's date of hire, this documentation was required. 2. A review of E2's personnel record did not include documentation of completed training on recognizing the signs and symptoms of TB. Based on E2's date of hire, this documentation was required. 3. A review of E6's personnel record did not include documentation of completed training on recognizing the signs and symptoms of TB. Based on E6's date of hire, this documentation was required. 4. A review of E8's personnel record did not include documentation of completed training on recognizing the signs and symptoms of TB. Based on E8's date of hire, this documentation was required. 5. A review of E9's personnel record did not include documentation of completed training on recognizing the signs and symptoms of TB. Based on E9's date of hire, this documentation was required. 6. A review of E10's personnel record did not include documentation of completed training on recognizing the signs and symptoms of TB. Based on E10's date of hire, this documentation was required. 7. In an interview, E1 acknowledged training and education related to recognizing the signs and symptoms of TB was not provided initially and annually to individuals employed by the health care institution. Technical assistance was provided regarding this rule during the compliance and complaint inspection conducted on May 18, 2023.”
The home's plan of correction
Temporary Solution All current employees whose files were missing TB education were immediately provided with the required training. Training included TB risk factors, prevention strategies, signs and symptoms, and reporting protocols. Documentation of completed signs and symptoms was placed in each employee’s personnel file. Name, title and/or Position of the Person Responsible Tatiana Houston, ALD, Interim Executive Director Permanent Solution A mandatory TB education and signs/symptom screening has been incorporated into the new hire orientation program. All staff will complete annual TB education training to remain compliant. The Human Resources (HR) department will maintain a training log to track completion. A checklist for personnel files will be used to verify that all required trainings, including TB education, are completed and documented before an employee begins work. Date temporary correction was complete 2025-05-30 Monitoring The HR Manager will conduct audits of personnel files to ensure TB education is documented for 100% of staff. Audit results will be reviewed during Quality Assurance and Performance Improvement (QAPI) meetings. Any missing documentation identified during audits will be corrected immediately, and retraining will be provided if necessary. Date permanent correction will be complete 2025-06-30
“Based on documentation review, record review, and interview, the manager failed to ensure that a caregiver's skills and knowledge were verified and documented before the caregiver provided health services for three of ten personnel sampled. The deficient practice posed a risk if a personnel member was unable to meet a resident's needs. Findings include: 1. A review of the facility's personnel schedule for February 2025 revealed E8 was scheduled to work and provide services on the following dates: February 6, 2025 from 10:00 PM - 6:00 AM; February 7, 2025 from 10:00 PM - 6:00 AM; February 8, 2025 from 10:00 PM - 6:00 AM; and February 13, 2025 from 10:00 PM - 6:00 AM. 2. A review of E8's personnel record revealed documentation of the verification of E8's skills and knowledge on February 14, 2025. However, this documentation was not completed before E8 provided physical health services. 3. A review of the facility's employee schedule for May 2025 revealed E9 was scheduled to work and provide services on the following dates: May 5, 2025 from 10:00 PM - 6:00 AM; May 9 2025 from 6:00 AM - 10:00 PM; and May 14, 2025 from 6:00 AM - 10:00 PM. 4. A review of the facility's employee schedule for May 2025 revealed E10 was scheduled to work and provide services on the following dates: May 11, 2025 from 6:00 AM - 2:00 PM; May 12, 2025 from 6:00 AM - 2:00 PM; and May 13, 2025 from 6:00 AM - 2:00 PM. 5. A review of E9's and E10's personnel records did not include documentation of the verification of E9's and E10's skills and knowledge before E9 and E10 began providing physical health services. 6. In an interview, E1 acknowledged verification of skills and knowledge was not documented in E8's, E9's, and E10's personnel records before E8, E9, and E10 provided physical health services. This is a repeat deficiency from the compliance and complaint inspection conducted on May 18, 2023.”
The home's plan of correction
Temporary Solution Immediate review of all current caregiver and assistant caregiver personnel files was completed to identify missing documentation. Caregivers and assistant caregivers whose files were incomplete were re-assessed on relevant skills and knowledge, including: Resident care techniques (transfers, bathing, feeding, medication assistance, etc.), Infection control and safety protocols, Recognition and reporting of changes in resident condition. Verification of skills and knowledge was documented in each employee file. Staff who had not demonstrated competency were provided immediate retraining and reassessment. Name, title and/or Position of the Person Responsible Tatiana Houston, ALD, Interim Executive Director Permanent Solution A standardized skills and knowledge verification checklist has been implemented for all caregivers. New hires will have all skills and knowledge verified before providing physical health services. Documentation of verification will be maintained in the employee file and tracked in the facility’s training log. Date temporary correction was complete 2025-05-23 Monitoring HR will conduct monthly audits of personnel files to ensure all caregivers have verified skills and knowledge documentation. Any gaps identified during audits will be corrected immediately, with retraining provided if necessary. Audit results will be reported to and reviewed during Quality Assurance and Performance Improvement (QAPI) meetings. Date permanent correction will be complete 2025-07-31
“Based on documentation review, record review, and interview, the manager failed to ensure that a caregiver provided evidence of freedom from infectious tuberculosis (TB) as specified in R9-10-113, for five of ten personnel sampled. The deficient practice posed a potential illness risk to residents. Findings include: 1. R9-10-113.A states, "If a health care institution is subject to the requirements of this Section, as specified in an Article in this Chapter, the health care institution's chief administrative officer shall ensure that the health care institution establishes, documents, and implements tuberculosis infection control activities that...2. Include: a. For each individual who is employed by the health care institution, provides volunteer services for the health care institution, or is admitted to the health care institution and who is subject to the requirements of this Section, screening, on or before the date specified in the applicable Article of this Chapter, that consists of: i. Assessing risks of prior exposure to infectious tuberculosis, ii. Determining if the individual has signs or symptoms of tuberculosis, and iii. Obtaining documentation of the individual's freedom from infectious tuberculosis according to subsection (B)(1)..." 2. A review of the Centers for Disease Control and Prevention website revealed a web page titled, "Guidelines for Preventing the Transmission of Mycobacterium tuberculosis in Health-Care Settings, 2005." The web page stated, "If TST (Mantoux Skin T est) is used for baseline testing, two-step testing is recommended for HCWs (Health Care Workers) whose initial TST results are negative. If the first-step TST result is negative, the second-step TST should be administered 1-3 weeks after the first TST result was read." 3. A review of E1's personnel record revealed a negative TB skin test that was less than 12 months old; however, no additional documentation of freedom from infectious TB was available for review. Based on E1’s date of hire, this documentation was required. 4. A review of E2's personnel record revealed a negative TB skin test that was more than 12 months old; however, no additional documentation of freedom from infectious TB was available for review. Based on E2’s date of hire, this documentation was required. 5. A review of E8's personnel record revealed two negative TB skin tests that were less than 12 months old. However, no documentation of a TB signs and symptoms screening and risk assessment signed by a registered nurse (RN) was available. Based on E8’s date of hire, this documentation was required. 6. A review of E9's personnel record revealed two negative TB skin tests that were less than 12 months old. However, no documentation of a TB signs and symptoms screening and risk assessment signed by an RN was available. Based on E9’s date of hire, this documentation was required. 7. A review of E10's personnel record revealed two negative TB skin tests that were less than 12 months old. However, no documentation of a TB signs and symptoms screening and risk assessment signed by an RN was available. Based on E10’s date of hire, this documentation was required. 8. In an interview, E1 acknowledged E1, E2, E8, E9, and E10 did not provide evidence of freedom from infectious TB as specified in R9-10-113.”
The home's plan of correction
Temporary Solution All current employees who were missing TB screening or risk assessment documentation were immediately screened for TB symptoms and assessed for risk and signed by NP. Documentation of completed TB signs and symptoms screening and risk assessment has been added to each employee’s personnel file. Name, title and/or Position of the Person Responsible Tatiana Houston, ALD, Interim Executive Director Permanent Solution All new employees will complete TB signs and symptoms screening and risk assessment during orientation before starting work. Date temporary correction was complete 2025-05-23 Monitoring HR now uses a checklist to verify that all employee health requirements, including TB screening, are complete and documented. The HR Manager will conduct audits of employee files to ensure TB screening is documented for 100% of staff. Any missing or incomplete documentation identified during audits will be corrected immediately. Audit results will be reviewed in Quality Assurance and Performance Improvement (QAPI) meetings to ensure ongoing compliance. Date permanent correction will be complete 2025-06-02
“Based on record review and interview, the manager failed to ensure that a resident had a written service plan that included the description of the resident's medical or health problems, including physical, behavioral, cognitive, or functional conditions or impairments, level of service the resident is expected to receive, a medication administration or assistance in the self-administration of medication, a resident who requires intermittent nursing services or medication administration, review by a nurse or medical practitioner. Findings Include: 1. A record review of R5's medical record revealed no documentation of a service plan. Based on R5's date of admission, this documentation was required. 2. In an interview, E1 acknowledged R5's medical record did not include a service plan that included the description of the resident's medical or health problems, including physical, behavioral, cognitive, or functional conditions or impairments, level of service the resident is expected to receive, a medication administration or assistance in the self-administration of medication, a resident who requires intermittent nursing services or medication administration, review by a nurse or medical practitioner.”
The home's plan of correction
Temporary Solution Resident whose service plans were missing have had current service plans created and completed. ALD and RCCs reviewed each resident’s care needs and preferences to ensure the service plan is accurate and individualized. Signed copies of completed service plans were placed in resident files. Name, title and/or Position of the Person Responsible Tatiana Houston, ALD, Interim Executive Director Permanent Solution Implemented a tracking system to ensure service plans are completed, signed, and filed within the required timeframe. All new residents will have a service plan completed during the admission process. Staff responsible for service plan completion will receive retraining on timelines, requirements, and documentation procedures. Date temporary correction was complete 2025-05-16 Monitoring ALD and RCCs will conduct audits of resident files to verify that all service plans are current, complete, and accurate. Any missing or incomplete service plans will be addressed immediately, and corrective action documented. Audit results will be reviewed during Quality Assurance and Performance Improvement (QAPI) meetings. Date permanent correction will be complete 2025-08-04
“Based on observation and interview, the manager failed to ensure that residents were treated with dignity, respect, and consideration. Findings Include: 1. During an environmental inspection of R2's room, the Compliance Officers observed urine on the bathroom floor. 2. During an environmental inspection of R3's room, the Compliance Officers observed urine dried on the kitchen floor and urine and feces in the bathroom. R3 stated, "They keep saying I made a mess". 3. During an environmental inspection of R7's room, the Compliance Officers observed feces in the bathroom. As well, the bed sheets had feces. 4. In an interview, E2 acknowledged that residents were not treated with dignity, respect, and consideration.”
The home's plan of correction
Temporary Solution Immediate counseling was provided to the staff involved regarding respectful communication and resident-centered care. The rooms were deep cleaned. The affected resident was personally reassured, and their preferences and concerns were addressed promptly. Name, title and/or Position of the Person Responsible Tatiana Houston, ALD, Interim Executive Director Permanent Solution All staff will complete annual mandatory training on resident rights, dignity, and respect, including communication, cultural sensitivity, and person-centered care practices. Staff will receive coaching on compassionate care practices, including active listening, privacy, and honoring resident choices. Date temporary correction was complete 2025-05-19 Monitoring Random resident interviews and satisfaction surveys will be conducted by the RCCs to ensure residents feel respected and valued. All resident interviews will be reviewed as part of our monthly Quality Assurance and Performance Improvement (QAPI) meetings, and corrective action will be taken if deficiencies are observed. Date permanent correction will be complete 2025-10-24
“Based on record review and interview, the manager failed to ensure that a resident's medical records contain medication orders from a medical practitioner for each medication that is administered to the resident. Findings Include: 1. A record review of R10's medication administration record revealed Fexofenadine 180 mg 1 tablet daily being administered. However, Fexofenadine was not listed on the medication order. 2. In an interview, E1 acknowledged that R10's medical record did not contain a medication order from a medical practitioner for each medication that is administered to the resident.”
The home's plan of correction
Temporary Solution Review all current medication administration records (MARs) to ensure that every medication being administered has a corresponding order from a licensed medical practitioner. For any medications found without an order, the administration of these medications has been temporarily suspended until proper orders are obtained. Obtained medication signed orders on all residents. Name, title and/or Position of the Person Responsible Tatiana Houston, ALD, Interim Executive Director Permanent Solution A new tracking sheet will be implemented to verify that physical medication orders are in place prior to administering any medication. This tracking sheet will track resident orders signed by a medical provider every 3 months for every resident. Date temporary correction was complete 2025-05-30 Monitoring Monthly audits will be performed by ALD. The results will be reviewed at our monthly QAPI meetings to ensure ongoing compliance. The audit will include checking the MARs for missing orders, confirming the presence of a valid order for each medication, and addressing any discrepancies immediately. Date permanent correction will be complete 2025-07-30
“Based on observation and interview, the manager failed to ensure that there was a means of exiting the facility that controlled or alerted employees of the egress of a resident from the facility. The deficient practice posed a risk if the facility was unaware of the general or specific whereabouts of a resident. Findings Include: 1. During an environmental inspection, the Compliance Officers observed a door that led to an outside patio. The door was not locked, and the alarm was not functioning. 2. In an interview, E2 acknowledged there was a means of exiting the facility that did not control or alert employees of the egress of a resident from the facility.”
The home's plan of correction
Temporary Solution Conduct an immediate assessment of all exits from the facility where direct care services are provided to identify areas where there is no alert mechanisms to prevent or notify staff of a resident’s unmonitored egress. Placed a temporary door alert alarm on the exit. Name, title and/or Position of the Person Responsible Tatiana Houston, ALD, Interim Executive Director Permanent Solution A licensed contractor has been hired to install audible and visual door alarms on all exterior exit doors where direct care services are provided. All alarms will sound locally and notify staff. All staff will receive training on: The new alert system functionality, Proper response protocols to alarms, Documentation procedures following an egress event. Date temporary correction was complete 2025-05-23 Monitoring A daily audit of alarm functionality and staff response will be performed for the first 30 days, then weekly for 60 days, and monthly thereafter. A monthly QA Performance Improvement (QAPI) review will include discussion of egress security until three consecutive months of compliance are documented. Date permanent correction will be complete 2025-10-31
“Based on observation and interview, the manager failed to ensure that food-contact surfaces were clean and in good repair. Finding Include: 1. During an environmental inspection of the memory care dining hall, the Compliance Officers observed a food warmer with grease stains and leftover food. The dining hall counters were not cleaned or in good repair. 2. In an interview, E1 acknowledged that equipment and food-contact surfaces were not cleaned and in good repair.”
The home's plan of correction
Temporary Solution An immediate inventory of all tableware, utensils, kitchen equipment, and food-contact surfaces was conducted. All items identified as unclean or in disrepair were either, Cleaned thoroughly using appropriate sanitation methods, or Removed from service if found to be beyond repair or compromised. Name, title and/or Position of the Person Responsible Tatiana Houston, ALD, Interim Executive Director Permanent Solution A comprehensive cleaning schedule has been implemented to ensure, Daily cleaning of all food-contact surfaces, utensils, and equipment used in food preparation and service. Weekly checks of all equipment for wear and tear, with immediate corrective action taken if repairs are needed. Periodic deep cleaning of the kitchen and food service areas. Use of a cleaning checklist to ensure all tasks are completed and documented daily. All kitchen and dietary staff will undergo a refresher training on, Proper cleaning and sanitation techniques. How to assess and identify damaged or worn-out utensils, tableware, or food-contact surfaces. Procedures for reporting and removing broken equipment or utensils from service. Date temporary correction was complete 2025-05-21 Monitoring Dietary Director will conduct weekly visual checks to assess cleanliness and condition of equipment. A work order will be made if any repairs or replacements for equipment and utensils is needed. These audits will be documented and retained for review during our monthly QAPI. Date permanent correction will be complete 2025-09-01
“Based on documentation review, observation and interview, the manager failed to ensure the premises and equipment used at the assisted living facility are cleaned and, if applicable, disinfected according to policies and procedures designed to prevent, minimize, and control illness or infection. Findings Include: 1. A review of policies and procedures revealed a document titled "Housekeeping", which stated "A housekeeping schedule will be maintained and will identify the day, time, and type of cleaning to be performed (i.e. routine(R), month(M), quarterly(Q), or annual (A) for resident." 2. A review of policies and procedures revealed a document titled "Unit Cleaning", which stated, "Weekly cleaning should not be an option." 3. A review of policies and procedures revealed a document titled "Cleaning of Common Areas", which stated, "Any area will be cleaned if found dirty, even if it is not the specific day for cleaning." 4. A review of policies and procedures revealed a document titled "Internal Environmental Services", which stated, "The community will be kept clean and well maintained. This will be accomplished through a regular cleaning schedule..." 5. During an environmental inspection of R2's room, the Compliance Officers observed dry urine in the entryway, on shoes, and in the bathroom. 6. During an environmental inspection of the dining hall, the Compliance Officers observed food splatter on the wall and baseboard. 7. During an environmental inspection of R4's room, the Compliance Officers observed excrement smeared throughout the floor, toilet, and there was a lingering smell. There was also an unknown liquid by the cat's litter box. 8. During an environmental inspection of R7's room, the Compliance Officers observed excrement smeared on the bedroom and bathroom floor. There was also excrement smeared on the bed sheets. 9. During an environmental inspection of the courtyard, the Compliance Officers observed dog poop. 10. In an interview, E1 acknowledged that the assisted living facility was not cleaned and not disinfected according to policies and procedures designed to prevent, minimize, and control illness or infection.”
The home's plan of correction
Temporary Solution Immediate Cleaning and Sanitizing: All identified areas were immediately cleaned and disinfected following appropriate infection control guidelines. All facility staff were notified of the deficiency and the urgent need for improved sanitation. Name, title and/or Position of the Person Responsible Tatiana Houston, ALD, Interim Executive Director Permanent Solution We will establish more detailed cleaning schedules to ensure all areas of the facility are cleaned according to state health guidelines. Increased focus on common areas such as bathrooms, dining areas, and hallways. All staff (including housekeeping and nursing staff) will undergo re-training on infection control and sanitation standards. Additional refresher training will be scheduled quarterly to ensure ongoing compliance. Date temporary correction was complete 2025-05-16 Monitoring Facility Director will monitor adherence to the cleaning schedule and perform weekly checks for cleanliness. These audits will be review in our monthly QAPI meetings. Date permanent correction will be complete 2025-07-16
“Based on observation and interview, the manager failed to ensure that poisonous or toxic materials stored by the assisted living facility were maintained in labeled containers in a locked area separate from food preparation and storage, dining areas, and medications, and were inaccessible to residents. Findings Include: 1. During an environmental inspection of the memory care unit, the Compliance Officers observed Fresh Scented Disinfecting Wipes (Store in original container in areas inaccessible to children). 2. In an interview, E1 acknowledged that poisonous or toxic materials stored by the assisted living facility were maintained in labeled containers in a locked area separate from food preparation and storage, dining areas, and medications, and were inaccessible to residents. This is a repeat deficiency from the complaint investigations conducted on September 20, 2022, and May 5, 2022.”
The home's plan of correction
Temporary Solution All toxins and hazardous substances identified in the memory care unit were immediately removed and securely stored in a locked, designated area that is inaccessible to residents. Staff were immediately reminded of the importance of storing hazardous materials securely and of the risks to residents. A full visual inspection of the memory care unit was conducted to ensure that all potentially dangerous items were identified and safely stored. Name, title and/or Position of the Person Responsible Tatiana Houston, ALD, Interim Executive Director Permanent Solution All staff will undergo re-training on the importance of securing hazardous substances and following proper protocols for their storage. Staff will receive quarterly training on infection control, safe chemical handling, and safe medication storage. Locked cabinets were instilled in memory care rooms to properly store these items. Date temporary correction was complete 2025-05-16 Monitoring Daily rounds will be conducted by staff to ensure that all chemicals and hazardous substances are properly stored. RCCs will conduct weekly checks of the memory care unit to ensure compliance with storage protocols. Results will be discussed in QAPI. Date permanent correction will be complete 2025-07-25
2024-11-19Complaint InvestigationNo findings
Plain-language summary
An on-site investigation of complaints AZ00218618 and AZ00218648 was conducted on November 19, 2024, and no deficiencies were cited.
2024-09-25Complaint InvestigationNo findings
Plain-language summary
An on-site investigation of complaint AZ00216485 was conducted on September 25, 2024, and no deficiencies were cited.
2024-07-18Complaint InvestigationNo findings
Plain-language summary
An on-site investigation of complaints AZ00213185, AZ00212494 were conducted on July 19, 2024, and no deficiencies were cited.
2024-07-03Complaint InvestigationNo findings
Plain-language summary
An on-site investigation of complaint AZ00212571 and AZ00210375 was conducted on July 3, 2024, and no deficiencies were cited.
2024-04-30Complaint Investigation1 finding
Plain-language summary
An on-site investigation of complaints AZ00208733, AZ00208979, and AZ00209426 was conducted on April 30, 2024, and the following deficiency was cited :
“Based on documentation review, record review, and interview, the manager failed to ensure a medication administered to a resident was administered in compliance with a medication order. Findings include: 1. During the complaint investigation, E1 reported and provided written documentation of a medication error during a two month period regarding R2's Metformin. Documentation stated, "The Metformin was not transcribed on the Medication Administration Record (MAR) and administered per order... Memantine was transcribed on the MAR but was only given for six days". The provider discontinued the Memantine nineteen days later. 2. Documentation review revealed the facility took immediate action following the discovery of the medication error. 3. Review of R2's medical record revealed that the resident required personal care and medication administration services. 4. In an interview, E1 acknowledged the medication error. This is a repeat deficiency from the complaint investigation conducted on January 10, 2024.”
The home's plan of correction
Date permanent correction will be complete 2024-04-22
2024-03-26Complaint InvestigationNo findings
Plain-language summary
An on-site investigation of complaint AZ00207668 was conducted on March 26, 2024, and no deficiencies were cited.
2024-02-15Complaint InvestigationNo findings
Plain-language summary
An on-site investigation of complaint AZ00206415 was conducted on February 15, 2024, and no deficiency was cited.
2024-01-25Complaint Investigation1 finding
Plain-language summary
An on-site investigation of complaint AZ00205390 and AZ00205549 was conducted on January 25, 2024, and the following deficiencies were cited:
“Based on record review, documentation review, and interview during the complaint investigation, the manager failed to ensure the facility had sufficient caregivers with the qualifications, experience, skills, and knowledge necessary to provide the assisted living services in the facility's scope of services, to meet the needs of a resident, and ensure the health and safety of a resident. Findings include: 1. The Department received notification from O1 and O2 that the facility was "understaffed" to meet the residents' needs including medication administration services to the second floor residents on Sunday, January 14, 2024. 2. During the investigation, E1 reported the caregiver responsible for providing the second floor residents their morning routine medications did not show up for work. Someone called the emergency responders from the city. By the time management of the facility was made aware that the residents were not receiving their morning medications, it was late morning before a qualified employee started providing these required medications that should have been given at 8:00 AM give or take one hour. 3. E1 reported there were qualified caregivers in other areas of the facility who had refused to go to the second floor to help meet the residents' medication administration needs. O1 also reported that other caregivers in other areas of the facility refused to go and help with the second floor medication needs. 4. Review of R1's medical record found that R1 required personal care and medication administration services. The January 2024 Medication Administration Record (MAR) found no documentation that R1's routine medications on January 14, 2024 were given. These scheduled medications were to be given: Carbidopa-Levodopa 25-100 at 7:00 AM. Healthylax Powder, Hydrochlorothiazide 50 mg, Lisinopril 5 mg, Meclizine 25 mg, Nystatin 100,000 unit, Tamsulosin HCL 0.4 mg, Vitamin D2 were all scheduled for 8:00 AM on this day. 5. In an interview with the facility's resident care coordinator regarding the residents on second floor who required personal care, medication administration services and also required insulin, six randomly selected residents' medication records were reviewed. The January 2024 MAR for these sampled residents did include the name of the medications and the scheduled time the medications were to be given. 6. R3's MAR had no documentation for 8:00 AM that R3 received Aspirin EC 81 mg, Brilinta 90 mg, Cinacalcet HCL 30 mg, Fish Oil 1000 mg, Omega-3 1 GM, Vitamin D3, and at 7:00 AM Humalog 100 units. 7. There was no documentation on R4's MAR that BD Unifine Pen NDL 5MM/30 at 7:00 AM and Insulin Aspart 100 units was given. At 8:00 AM Dabigatran Etexilate 150 mg, Loratadine 10 mg, Metoprolol Tartrate 25 mg, Omeprazole DR 10 mg, Pantoprazole DR 20 mg, Triamcinolone 0.1% ointment, and Ziprasidone HCL 40 mg were given as scheduled. 8. There was documentation on the MAR that R5's order for BD Pen needle ulticare 32 G was scheduled on the 14th of January at 7:00 AM however was recorded at 1:53 PM, the Freestyle Libre 2 reader used to check the blood sugar at 8:00 AM was recorded at 1:53 PM. 9. In an interview, E1 acknowledged the morning of January 14, 2024 facility was lacking adequate staffing to meet the second floor residents' medication needs.”
The home's plan of correction
Date permanent correction will be complete 2024-02-15
2024-01-10Complaint Investigation4 findings
Plain-language summary
An on-site investigation of complaint AZ00205055 was conducted on January 10, 2024, and the following deficiencies were cited:
“Based on record review and interview, the manager of an assisted living center who contacted an emergency responder on behalf of a resident failed to provide to the emergency responder a written document that included all required documentation, for one of one applicable resident sampled. Findings include: 1. A review of R1's medical record revealed an incident report dated January 4, 2023. The incident report revealed R1 had an accident, emergency, or injury, the facility contacted an emergency responder, and R1 was taken to the hospital. However, the documented form provided to the emergency responder did not include the following: -The reason or reasons the emergency responder was requested on behalf of R1; -The point-of-contact information for the assisted living center, including the cell phone number and email address; and -A copy of R1's health insurance portability and accountability act (HIPAA) release authorizing a receiving hospital to communicate with the assisted living center to plan for R1's discharge. 2. In an interview, E1 reported E1 was familiar with this statute. E1 reported the facility had standardized forms for the information in Arizona Revised Statutes (A.R.S.) \'a7 36-420.04(A)(3)-(7) and printed other documents to meet the rest of the requirements in A.R.S. \'a7 36-420.04(A) as needed. However, E1 acknowledged the form did not include all required information. E1 reported not knowing the form needed to include a copy of a resident's HIPAA release, and reported E1 would have to update the standardized forms.”
The home's plan of correction
Date permanent correction will be complete 2024-02-15
“Based on record review and interview, the manager of an assisted living center failed to maintain a copy of the document provided to the emergency responder which included the items listed in Arizona Revised Statutes (A.R.S.) \'a7 36-420.04(A)(1)-(9), for one of one applicable resident sampled. Findings include: 1. A review of R1's medical record revealed an incident report dated January 4, 2023. The incident report revealed R1 had an accident, emergency, or injury, the facility contacted an emergency responder, and R1 was taken to the hospital. 2. In an interview, E1 reported E1 was familiar with this statute. E1 reported the facility had standardized forms for the information in A.R.S. \'a7 36-420.04(A)(3)-(7) and printed other documents to meet the rest of A.R.S. \'a7 36-420.04(A) as needed. When the Compliance Officer requested documentation of compliance with this statute, E1 reported the facility did not keep a copy of the documentation provided to the emergency responder.”
The home's plan of correction
Date permanent correction will be complete 2024-02-15
“Based on record review and interview, the manager failed to ensure medication administered to a resident was administered in compliance with a medication order, for one of one resident sampled. The deficient practice posed a risk if a resident experienced a change in condition due to improper administration of medication. Findings include: 1. A review of R1's medical record revealed a current service plan which revealed R1 required medication administration services. The review revealed a medication order for "BUSPIRONE HCL 15 MG (milligrams) TABLET...TAKE 1 TABLET BY MOUTH TWICE DAILY" with a start date of March 13, 2023, and a medication order for "LIDOCAINE PAIN RELIEF 4% PA...APPLY 1 PATCH TRANSDERMALLY TO AFFECTED AREA ONCE DAILY" with a start date of March 13, 2023. The review further revealed a medication administration record (MAR) for R1 dated December 2023. The MAR indicated R1 did not receive R1's second dose of "BUSPIRONE" on December 10, 2023, because the "Medication [was] not available." The MAR also indicated R1 did not receive R1's "LIDOCAINE" on December 15, 2023, because the "Medication [was] not available." 2. In an interview, E1 reported care staff were supposed to get orders to hold medication when the medication was not available. 3. A review of R1's medical record revealed no order to hold R1's "BUSPIRONE" on December 10, 2023, or R1's "LIDOCAINE" on December 15, 2023.”
The home's plan of correction
Date permanent correction will be complete 2024-02-15
“Based on record review and interview, the manager failed to ensure when a resident had an accident, emergency, or injury that resulted in the resident needing medical services, a caregiver or an assistant caregiver documented the names of individuals who observed the accident, emergency, or injury and any action taken to prevent the accident, emergency, or injury from occurring in the future, for one of one resident sampled. The deficient practice posed a risk of potential re-injury. Findings include: 1. A review of R1's medical record revealed an incident report dated January 4, 2023. The incident report revealed R1 had an accident, emergency, or injury and was taken to the hospital. However, the document did not include the names of individuals who observed the accident, emergency, or injury or any action taken to prevent the accident, emergency, or injury from occurring in the future. 2. In an interview, E2 acknowledged the incident report did not include the aforementioned information. Technical assistance was provided on this rule during the complaint/compliance inspection conducted on May 19, 2023.”
The home's plan of correction
Date permanent correction will be complete 2024-02-15
2023-12-28Complaint InvestigationNo findings
Plain-language summary
An on-site investigation of complaints AZ00202001, AZ00202040, AZ00203104, AZ00203819, and AZ00204126 was conducted on December 28, 2023, and no deficiency was cited .
Source: Arizona Dept. of Health Services · Bureau of Residential Facilities Licensing. ADHS inspection portal →
Other memory care options nearby.
Desert Palace Assisted Living
Chandler
Boston Manor 1
Chandler
Ana's Haven Adult Home Care II
Chandler
Holy Name Assisted Living, LLC
Chandler
Archangel Assisted Living Inc.
Chandler
Brookdale Chandler Regional
Chandler
Mosaic Gardens Memory Care at Chandler
Chandler
Pennington Gardens
Chandler
Willow Canyon LLC
Chandler
Desert Springs Assisted Living, LLC
Chandler
Copper Creek Inn Memory Care Community
Chandler
Yucca Assisted Living LLC
Chandler