2026-09-15Annual Compliance VisitNo findings

Plain-language summary

During a routine annual inspection on September 15, 2026, the facility was found to be in compliance with all health and safety requirements, including proper medication storage, working fire and carbon monoxide detectors, adequate lighting and temperature, grab bars in bathrooms, and sufficient food supplies. Staff records showed current first aid training, emergency drills were conducted recently, and the facility is licensed to care for up to six non-ambulatory residents. The inspector requested updated copies of several administrative documents to be submitted by October 1, 2026, but found no violations.

Read raw inspector notes

On 9/15/2026 at 12:30 PM, Licensing Program Analyst (LPA) A. Gomez arrived unannounced to conduct 1-Year Annual Required inspection. LPA met with Administrator, Tayyaba Chaudhry and explained the purpose of the visit. The facility’s fire clearance was approved for 6 non-ambulatory of which one may be bedridden in room 3. LPA toured facility with Administrator including but not limited to bedrooms, bathrooms, kitchen, common area and backyard. All outdoor and indoor passageways are kept free of obstruction. There are no bodies of water observed. A comfortable temperature is maintained at 76 degrees Fahrenheit. LPA observed lighting in all rooms are adequate for the comfort and safety of the residents. The hot water temperature in the residents’ shared bathroom was measured at 113.6 degrees Fahrenheit. Residents’ bathrooms are equipped with grab bars and non-skid mats. There is a minimum of one week supply of nonperishable and 2-day of perishable foods. Centrally stored medication and sharps were locked and inaccessible to residents. Smoke detectors and carbon monoxide detector were in operating condition during visit. Fire extinguisher was last serviced on 01/22/2025. Emergency Disaster Plan was last posted on 2/21/2026. First aid kit was observed to be complete. Emergency disaster drill and fire drill was last conducted on 07/07/2026. LPA reviewed 6 residents records. LPA reviewed 3 staff records and 3 of 3 have current first aid training and associated to the facility. Updated copies of the following documents were requested for facility file and are to be mailed to CCL by 10/01/2026: LIC 308 Designation of Administrative Responsibility LIC 309 Administrative Organization LIC 500 Personnel Report LIC 610E Emergency Disaster Plan Liability Insurance Current Administrator’s Certificate No deficiencies cited during visit. Exit interview conducted and a copy of this report provided.

2025-10-01Annual Compliance VisitNo findings

Plain-language summary

On October 1, 2025, an unannounced annual inspection found no deficiencies at this six-resident facility. The inspector verified that bedrooms, bathrooms, and common areas met safety standards, including working smoke and carbon monoxide detectors, proper grab bars, locked medications, and adequate food and supplies. All three staff members on file had current first aid training.

Read raw inspector notes

On 10/1/2025 at 8:30 AM, Licensing Program Analyst (LPA) A. Gomez arrived unannounced to conduct 1-Year Annual Required inspection. LPA met with Administrator, Tayyaba Chaudhry and explained the purpose of the visit. The facility’s fire clearance was approved for 6 non-ambulatory of which one may be bedridden in room 3. LPA toured facility with Administrator including but not limited to bedrooms, bathrooms, kitchen, common area and backyard. The facility consists of 7 total bedrooms which 6 bedrooms are occupied by the residents and 1 bedroom is occupied by staff. All outdoor and indoor passageways are kept free of obstruction. There are no bodies of water observed. A comfortable temperature is maintained at 76 degrees Fahrenheit. LPA observed lighting in all rooms are adequate for the comfort and safety of the residents. The hot water temperature in the residents’ shared bathroom was measured at 116.1 degrees Fahrenheit. Residents’ bathrooms are equipped with grab bars and non-skid mats. There is a minimum of one week supply of nonperishable and 2-day of perishable foods. Centrally stored medication and sharps were locked and inaccessible to residents. Smoke detectors and carbon monoxide detector were in operating condition during visit. Fire extinguisher was last serviced on 01/22/2025. Emergency Disaster Plan was last posted on 01/25/2025. First aid kit was observed to be complete. Emergency disaster drill and fire drill was last conducted on 07/25/2025. At 10:00 am, LPA reviewed 6 residents records. At 10:30 am, LPA reviewed 3 staff records and 3 of 3 have current first aid training and associated to the facility. No deficiencies cited during visit. Exit interview conducted and a copy of this report provided.

2024-09-25Annual Compliance Visit1 finding

Inspector · Alona Gomez

Plain-language summary

During a routine annual inspection on September 25, 2024, inspectors found the facility generally well-maintained with adequate lighting, temperature control, safety equipment, and food supplies, but noted that a bed rail in one resident's room presented a potential entrapment hazard and required removal. The facility's staff met training requirements, medications and sharp objects were properly secured, and emergency drills had been conducted, though the facility needed to submit updated emergency planning documents by the deadline.

Type B22 CCR §87608(a)(5)(B)
Verbatim citation text · 22 CCR §87608(a)(5)(B)

“Based on observation, the licensee did not comply with the section cited above in having a full bed rail in R6's room. Administrator does not have an exception for full bed rails and was unable to locate physician's order which poses a potential health, safety or personal rights risk to persons in care. POC Due Date: 09/25/2024 Plan of Correction 1 2 3 4 The bed rail was removed during the visit. POC cleared.”

Read raw inspector notes

On 9/25/2024 at 9:10 AM, Licensing Program Analyst (LPAs) A. Gomez and P. Manalo arrived unannounced to conduct 1-Year Annual Required inspection. LPA met with Administrator, Tayyaba Chaudhry and explained the purpose of the visit. The facility’s fire clearance was approved for 6 non-ambulatory of which one may be bedridden in room 3. LPAs toured facility with Administrator including but not limited to bedrooms, bathrooms, kitchen, common area and backyard. The facility consists of 7 total bedrooms which 6 bedrooms are occupied by the residents and 1 bedroom is occupied by staff. All outdoor and indoor passageways are kept free of obstruction. There are no bodies of water observed. A comfortable temperature is maintained at 78 degrees Fahrenheit. LPAs observed lighting in all rooms are adequate for the comfort and safety of the residents. The hot water temperature in the residents’ shared bathroom was measured at 117.8 degrees Fahrenheit. Residents’ bathrooms are equipped with grab bars and non-skid mats. There is a minimum of one week supply of nonperishable and 2-day of perishable foods. Centrally stored medication and sharps were locked and inaccessible to residents. Smoke detectors and carbon monoxide detector were in operating condition during visit. Fire extinguisher was last serviced on 01/10/2024. Emergency Disaster Plan was last posted on 01/01/2024. First aid kit was observed to be complete. Emergency disaster drill and fire drill was last conducted on 07/28/2024. At 10:30 am, LPA reviewed 6 residents records. At 11:15 am, LPA reviewed 4 staff records and 4 of 4 have current first aid training and associated to the facility. Report Continues on LIC 809-C 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 THE FOLLOWING DEFICIENCY WERE OBSERVED DURING VISIT: At 10:30 am, LPAs observed a full bed rail in R6's room. Administrator removed the bottom rails, POC cleared. Updated copies of the following documents were requested for facility file and are to be submitted to CCL by 10/02/2024: LIC 500 Personnel Report LIC 610E Emergency Disaster Plan The following deficiency was observed (see LIC 809D) and cited from the California Code of Regulations, Title 22 and/or Health and Safety Code. Failure to correct deficiency by POC date may result in additional Civil Penalties. Exit interview conducted. Appeal Rights and a copy of this report provided.

Source: California Dept. of Social Services · Community Care Licensing. CDSS inspection portal →

Related in this city

Other memory care options nearby.

Navajo Care Home, Alamo: Inspection Reports and Citations