Mount Vernon of South Park: inspection reports
The PA DHS record for Mount Vernon of South Park in South Park Townshi, PA: every visit in the last three years, with each citation in the inspector’s own words. Back to the profile and its summaries.
4 visits, most recent first.
2025-11-13Annual Compliance Visit6 findings
Plain-language summary
On this compliance visit, the Pennsylvania Department of Human Services file includes this account: The fire extinguisher located in the physical therapy room did not have an inspection date marked on it.
“Doorknobs were missing from bathroom doors in bedrooms. This was a repeat violation.”
The home's plan of correction
All hardware was installed on the bathroom doors in bedrooms on 11/24/25. The administrator trained the maintenance lead on regulation 88a on 11/25. The maintenance lead will conduct weekly audits for 3 weeks, then monthly for 2 months to ensure compliance, to be completed by 1/31.
“None of the first aid kits included tweezers, which are a required component.”
The home's plan of correction
Tweezers were placed in each first aid kit on 11/24/25. The administrator will conduct first aid kit audits monthly for three months and annually thereafter during May. Staff was trained on requirement 96a on 11/25/25.
“During a fire drill on 11/13/2025 at 4:35 p.m., the home evacuated 10 out of 11 residents, failing to evacuate one resident from their room.”
The home's plan of correction
The resident was moved to a different room in a fire-safe area of the home to support future evacuation of all residents. Evacuation of all residents was monitored during the November fire drill to be completed by 11/30. The administrator will audit fire drill records monthly to ensure unannounced fire drills are held at least monthly with complete evacuation of all residents.
“Two showers in the secured dementia care unit multi-shower bathroom lacked doors or partitions to provide privacy.”
The home's plan of correction
A shower curtain system was installed in the SDCU multi-shower bathroom. The home was directed to reduce SDCU capacity to 10 persons due to the multi-occupant bathroom, as shower curtains do not constitute adequate privacy per § 2600.42(s). The administrator will audit common bathrooms weekly to ensure resident privacy and that only one resident uses the common shower at a time, with documentation maintained.
“The secured dementia care unit had 5 exit doors leading to a secured, fenced courtyard with 2 locked gates controlled by a fire alarm system and power failure, but lacked a manual override mechanism such as a keypad. This was a repeat violation.”
The home's plan of correction
Keypads were installed and tested on 11/24/25 to provide manual override of the locked gates and ensure unobstructed egress. Staff was trained on requirement 121a on 11/25/25. Documentation will be maintained per 65i.
“The fire extinguisher located in the physical therapy room did not have an inspection date marked on it.”
The home's plan of correction
The fire extinguisher in the physical therapy room was removed on the day of inspection. All fire extinguishers on-site were certified in May 2025 with inspection dates documented. Annual inspections are scheduled for May 2026. The maintenance lead and administrator will audit all fire extinguishers annually in May, with documentation kept with fire safety certifications.
2025-07-22Annual Compliance Visit6 findings
Plain-language summary
On this compliance visit, the Pennsylvania Department of Human Services file includes this account: The resident-home contracts for residents #1 and #2 did not specify the conditions for admission and discharge to determine whether a higher level of care is appropriate, despite indicating termination conditions such as 'needs.
“The home's inspection summaries dated 6/9/25 and 4/29/25 and a copy of Chapter 2600 regulations were not posted in a public and conspicuous place in the personal care home.”
The home's plan of correction
On 7/28, the home's inspection summaries dated 6/9 and 4/29, as well as a copy of chapter 2600, were added to the Emergency Preparedness binder as separate tabs by the administrator. A new permanent hanging location has been added next to other required postings to avoid the temporary removal of this documentation, photo attached. The availability of a copy of ch2600 and LIS were added to the instructions on the weekly Grounds Monitoring Log, which is signed off by the Administrator or designee weekly. All staff and residents will be trained on the location and contents of the required postings by the Administrator by 8/8/25 and this has been added to day 1 orientation for all new employees and residents.
“The resident-home contracts for residents #1 and #2 did not describe the need for a medical evaluation or the procedures to be followed if either the assessment or the medical evaluation indicated the need of another and more appropriate level of care.”
The home's plan of correction
The contact has been amended by the administrator to include the required language for the need for a medical evaluation. A thirty day notice of the change will be emailed to the POAs for resident #1 and #2 following approval in this LIS and POC. An audit of all current and newly completed resident contracts have been audited on 8/4 for accuracy by the administrator. 3 out of 3 residents (inclusive of the two in the LIS) will be sent the 30 day notice with corrections on accuracy upon approval of the attached contract and addendums on this POC submittal. The contract has been amended for all future resident agreements upon approval of this POC.
“The resident-home contracts for residents #1 and #2 did not specify the conditions for admission and discharge to determine whether a higher level of care is appropriate, despite indicating termination conditions such as 'needs exceeding facility capabilities' and 'residents require higher level of care.'”
The home's plan of correction
The contact has been amended by the administrator to include the required language on the definition of services provided and not provided. A thirty day notice of the change will be emailed to the POAs for resident #1 and #2 following approval in this LIS and POC. A review of the third resident on-site will also be completed and corrected with a 30 day notice. An audit of all current and newly completed resident contracts have been audited on 8/4 for accuracy by the administrator. 3 out of 3 residents (inclusive of the two in the LIS) will be sent the 30 day notice with corrections on accuracy upon approval of the attached contract and addendums on this POC submittal. The contract has been amended for all future resident agreements upon approval of this POC.
“There were no signs posted at the entrances to the home indicating that video recording was taking place, despite staff indicating that video recording was occurring at the entrances.”
The home's plan of correction
The administrator has posted a sign indicating that video recording is happening on the front door during the time of the inspection. This check, to ensure the sign remains in place, has been added to the weekly ground check audit which is signed by the administrator or designee.
“On 7/19/25 and 7/20/25, with 2 residents present, the only staff person trained in first aid and CPR present in the home (direct care staff person A) had a certification that expired in April 2025.”
The home's plan of correction
The administrator's designee has contacted The American Red Cross for training and will have a training in place for all employees by August 8. It will be a requirement of all direct care staff to attend. The upcoming schedule has been reviewed and revised to ensure there is at least one staff person present in the home with a current certification. The administrator, or Director of Operations, will review the staff schedule on a weekly basis to ensure at least one staff person for every 50 residents who is trained in first aid and certified in obstructed airway techniques and CPR will be in the home at all times. This review will begin on 8/11.
“The staff training plan for 2025 did not include the name, position and duties of each direct care staff person, nor the dates, times and locations of scheduled training for each staff person for the upcoming year.”
The home's plan of correction
The administrator has updated the staff training schedule for the next 12 months including the position name, date, time and locations. A monthly training audit, to ensure the staff training plan is current and updated and followed-through-with, has been added to the monthly safety policy review and will be signed by the administrator or designee. This audit will begin with the August monthly audit.
2025-06-09Annual Compliance Visit5 findings
Plain-language summary
On this compliance visit, the Pennsylvania Department of Human Services file includes this account: Two of four hot water tanks were inoperable; fire-safe doors near bedroom #7 did not securely close into the door frame; and the fire panel displayed an error message indicating 'trouble cnt:7'.
“No carbon monoxide detector was present near the gas Lennox furnace located in the home's basement, in violation of The Care Facility Carbon Monoxide Alarms Standard Act which requires alarms within 15 feet of fossil-fuel burning devices.”
The home's plan of correction
CO2 monitors have been installed near each of 7 fossil-fuel burning locations in the home. Carbon monoxide detectors will be monitored monthly to address batteries if necessary. Monthly checks began on 6/1/25. Batteries will be changed annually alongside the May fire safety inspection.
“No hot water was available at bathroom sinks in bedrooms #1, #9, #12, and #16, and no hot or cold water was available at the two kitchen sinks, failing to meet water pressure requirements.”
The home's plan of correction
All four hot water tanks are in operable condition and set at 115 degrees as of 5/14/25. Hot water is available throughout the building. Weekly temperature readings are taken and recorded for kitchen, laundry, and 3 random resident rooms for the first two months, then monthly monitoring. Weekly checks began on 6/1/25.
“Two of four hot water tanks were inoperable; fire-safe doors near bedroom #7 did not securely close into the door frame; and the fire panel displayed an error message indicating 'trouble cnt:7'.”
The home's plan of correction
All four hot water tanks are in operable condition and set at 115 as of 5/14/25. As of 5/15/25, fire panel and all alarms are in working order with fire doors in operable condition and no errors on display. Pittsburgh Fire Sprinkler completed repairs on 5/15/25 and is under contract for continued maintenance. Beginning 6/1/25, the administrator/designee shall inspect the home weekly to ensure all furniture and equipment is in good repair, clean and free of hazards.
“The main entrance was actively under construction with exposed construction materials, tools, ladders, and electrical cords; and light poles were cut and laying on the ground along a rear walkway with exposed electrical wiring at the base.”
The home's plan of correction
The side employee entrance accessible from the main parking lot serves as the primary entrance until construction completion. The main entrance construction was completed by 5/21 with all equipment removed. Light poles in the secured memory unit exterior yard will be removed by 5/21 as part of landscaping. Beginning 6/1/25, the administrator/designee shall inspect the exterior weekly to ensure the building and grounds are in good repair and free of hazards.
“No grab bar was present at the toilet in the shared bathroom of bedroom #1.”
The home's plan of correction
A grab bar was installed in the shared bathroom of bedroom #1 on 4/29/25. An inspection of all bathrooms confirmed that all grab bars are installed.
2025-04-29Annual Compliance Visit5 findings
Plain-language summary
On this compliance visit, the Pennsylvania Department of Human Services file includes this account: Two of four hot water tanks were inoperable; fire-safe doors near bedroom #7 did not securely close into the door frame; and the fire panel displayed an error message indicating 'trouble cnt:7'.
“No grab bar was present at the toilet in the shared bathroom of bedroom #1.”
The home's plan of correction
A grab bar was installed in the shared bathroom of bedroom #1 on 4/29/25. An inspection of all bathrooms confirmed that all grab bars are installed.
“No carbon monoxide detector was present near the gas Lennox furnace located in the home's basement, in violation of The Care Facility Carbon Monoxide Alarms Standard Act which requires alarms within 15 feet of fossil-fuel burning devices.”
The home's plan of correction
CO2 monitors have been installed near each of 7 fossil-fuel burning locations in the home. Carbon monoxide detectors will be monitored monthly to address batteries if necessary. Monthly checks began on 6/1/25. Batteries will be changed annually alongside the May fire safety inspection.
“No hot water was available at bathroom sinks in bedrooms #1, #9, #12, and #16, and no hot or cold water was available at the two kitchen sinks, failing to meet water pressure requirements.”
The home's plan of correction
All four hot water tanks are in operable condition and set at 115 degrees as of 5/14/25. Hot water is available throughout the building. Weekly temperature readings are taken and recorded for kitchen, laundry, and 3 random resident rooms for the first two months, then monthly monitoring. Weekly checks began on 6/1/25.
“Two of four hot water tanks were inoperable; fire-safe doors near bedroom #7 did not securely close into the door frame; and the fire panel displayed an error message indicating 'trouble cnt:7'.”
The home's plan of correction
All four hot water tanks are in operable condition and set at 115 as of 5/14/25. As of 5/15/25, fire panel and all alarms are in working order with fire doors in operable condition and no errors on display. Pittsburgh Fire Sprinkler completed repairs on 5/15/25 and is under contract for continued maintenance. Beginning 6/1/25, the administrator/designee shall inspect the home weekly to ensure all furniture and equipment is in good repair, clean and free of hazards.
“The main entrance was actively under construction with exposed construction materials, tools, ladders, and electrical cords; and light poles were cut and laying on the ground along a rear walkway with exposed electrical wiring at the base.”
The home's plan of correction
The side employee entrance accessible from the main parking lot serves as the primary entrance until construction completion. The main entrance construction was completed by 5/21 with all equipment removed. Light poles in the secured memory unit exterior yard will be removed by 5/21 as part of landscaping. Beginning 6/1/25, the administrator/designee shall inspect the exterior weekly to ensure the building and grounds are in good repair and free of hazards.
Source: Pennsylvania Department of Human Services, Office of Long-Term Living. PA DHS inspection portal →