2025-12-29Annual Compliance Visit4 findings
Plain-language summary
On this compliance visit, the Pennsylvania Department of Human Services file says: A resident prescribed blood sugar checks three times per week had discrepancies between glucometer readings and documentation in the log, indicating improper medication administration record procedures and documentation practices.
“A resident's current medical evaluation was not present in the medical record. The initial medical evaluation was completed but no annual update was documented.”
The home's plan of correction
An updated DME has been completed for resident. A comprehensive audit of all resident charts was completed on 11/18/2025 by the Regional Director of Staff Development and reviewed with the PCHA. The PCHA will audit DME completion monthly for 3 months and will be reviewed by NHA at quarterly QI meetings to determine a continued need based on compliance. Education related to this regulation has been completed with LPN supervisors.
“A glucometer belonging to a resident was found in the home's medication cart; however, the resident was away from the home at the time of inspection, making the equipment current unnecessary.”
The home's plan of correction
The glucometer was removed by the PCHA from the med cart immediately following the survey 12/29/25. A comprehensive med cart audit was conducted by PCHA/designee 1/5/2026 to ensure compliance. LPN supervisors or PCHA will complete a med cart audit weekly on an ongoing basis to maintain compliance. The audit results will be reviewed by NHA during quarterly QI meetings to ensure continued compliance.
“A bottle of Vitamin D belonging to a resident in the home's medication cart was not labeled with the resident's name.”
The home's plan of correction
On the day of survey, the OTC bottle was labeled appropriately. The administrator or designee will perform medication carts weekly. Pre made resident labels have been added to each cart to ensure all OTC/sample medications are labeled. Cart audits will be ongoing process. Audits will be reviewed during quarterly Quality improvement meetings. Within 5 days of the receipt of the acceptable plan of correction, the administrator or designee shall perform weekly medication cart audits for two months, then monthly for three months.
“A resident prescribed blood sugar checks three times per week had discrepancies between glucometer readings and documentation in the log, indicating improper medication administration record procedures and documentation practices.”
The home's plan of correction
Effective 12/30/2025, a daily audit of glucometer readings and EMAR documentation will be completed by LPN supervisors or PCHA and will continue to be monitored daily x 3 months. Education regarding glucose monitoring and recording competency as well as EMAR amendments was provided to all diabetic certified med techs by on or before 1/16/2026. NHA will review the audits during quarterly QI meetings and determine need for further monitoring. Within 5 days of the receipt of the acceptable plan of correction, the administrator or designee shall perform weekly glucometer/Medication administration record audits for two months, then monthly for three months.
2025-10-02Annual Compliance Visit7 findings
Plain-language summary
On this compliance visit, the Pennsylvania Department of Human Services file includes this account: Resident #2's record did not contain a statement signed by the resident acknowledging receipt of a copy of the resident rights and complaint procedures.
“The resident-home contract for Resident #2 was not signed by the administrator or designee and was not signed by the resident.”
The home's plan of correction
Resident #2 reviewed and signed the contract with present. The PCHA educated marketing personnel and the move in coordinator on regulation 2600.25B. All unsigned contracts were reviewed and signatures obtained. Starting 11/17/2025, each new resident contract will be audited within the first thirty days of admission by the administrator on an ongoing basis.
“The home did not report the unexpected passing of Resident #1 to the Department within 24 hours as required for reportable incidents.”
The home's plan of correction
Starting 11/20/2025, LPN supervisors will be provided education regarding reportable incidents as they will be responsible for completing and accurately reporting incidents. This education will have an emphasis on the regulation as well as correct spelling and dating. All reportable incidents moving forward will be audited within 24hours by the administrator or designee for accuracy and resubmitted as needed. Within 10 days of receipt of the plan of correction, the administrator shall provide education to all staff of the requirements to time report incidents and conditions.
“Resident #2's record did not contain a statement signed by the resident acknowledging receipt of a copy of the resident rights and complaint procedures.”
The home's plan of correction
The unsigned contract was reviewed with the resident then signed with present. The PCHA educated marketing personnel and the move in coordinator on regulation 2600.41e. Starting 10/6/2025, the marketing assistant will audit all personal care charts, review the information, and obtain appropriate signatures or document if the resident is unable to sign by 11/14/2025. Starting 11/17/2025, the PCHA or designee will audit new charts for signatures within the first 30 days of admission on an ongoing basis.
“The home's staff training plan does not include times for scheduled trainings, only projected dates of December 31, 2025. This is a repeat violation from 11/7/24.”
The home's plan of correction
On 11/7/2025 the PCHA in-serviced the Human Resources Generalist on regulation 66b. The community training plan has been updated to include dates, times, and the location of the training. Starting 12/2/2025, the Human Resources Generalist will audit all new employee training plans with results discussed during quarterly QI meetings.
“On 10/2/25 at 10:10am, there was no thermometer in the Carson freezer. Food requiring refrigeration must be stored at or below 40°F and frozen food at or below 0°F, with thermometers required in refrigerators and freezers.”
The home's plan of correction
On 10/3/2025, the facilities director installed a thermometer in the freezer. Starting 10/4/2025 the PCHA or designee will randomly check refrigerators and freezers for working thermometers during weekly rounds for one month, then for two months. Audit results will be reviewed during quarterly Quality Improvement meetings.
“On 10/2/25, there was approximately 1 inch accumulation of lint in the Wesley Commons third floor laundry room dryer lint trap and approximately 1/2 inch accumulation in the Carson second floor laundry room dryer lint trap. Lint must be removed from lint traps after each use to reduce fire hazards.”
The home's plan of correction
Starting 10/3/2025, all care staff were in-serviced on the hazards of not cleaning dryer lint traps after each load. A lint check sheet will be added to the laundry room, and direct care staff members will initial the sheet each shift. The PCHA or designee will randomly check dryers and sign-off sheets weekly for 4 weeks, then for two months. Within 10 days of receipt, the administrator shall provide education to all staff on the requirements of 105g.
“Resident #3's most recent medical evaluation was not completed as required annually. This is a repeat violation from 11/7/24.”
The home's plan of correction
Starting 10/4/2025, the PCHA or designee will audit each resident record for two consecutive years of DMEs and ensure all 2025 DMEs are completed and up to date by 11/14/2025. Effective 11/17/2025, family members for all residents with outside providers will be given a copy of DME 30 days prior to due date, and LPN Supervisors will call, fax, and email provider notifications. LPN Supervisors will audit DMEs monthly for six months.
2025-08-28Annual Compliance Visit3 findings
Plain-language summary
On this compliance visit, the Pennsylvania Department of Human Services file includes this account: Resident medical evaluation did not include temperature at time of evaluation, medication regimen, contraindicated medications, medication side effects, ability to self-administer medications, or body positioning and movement.
“Stairway Tower #4 connecting the second and first floors has a damaged step at the edge that poses a tripping hazard.”
The home's plan of correction
The stairway tripping hazard identified on the day of survey was corrected immediately. Facility manager was in-serviced on this regulation beginning September 16, 2025. Facility Manager/Designee will monitor for compliance weekly for one month and spot check monthly. Results will be reviewed quarterly during Quality Improvement meetings.
“A cloth STOP sign covering a resident room door blocked egress from the room while the resident was present inside, obstructing the egress route.”
The home's plan of correction
Immediately after survey, the stop sign was removed. On 9/4/2025, administrator inspected all PC rooms with no other stop signs found. During weekly rounds, administrator or designee will spot check to ensure no stop signs in use. Personal care administrator will educate all PC nurses not to use stop signs in SDCU. If a resident needs one, cognitive and OT assessments must be completed first. Any resident using a stop sign will be reassessed quarterly for appropriateness.
“Resident medical evaluation did not include temperature at time of evaluation, medication regimen, contraindicated medications, medication side effects, ability to self-administer medications, or body positioning and movement stimulation information.”
The home's plan of correction
Request made to resident's PCP to complete new DME in its entirety. Beginning September 16, 2025, Administrator or designee will audit Documentation of Medical Evaluation for four residents first week, then 10 residents weekly until all current residents' DME reviewed and corrected with physician consent. New admissions' DME will be completed in entirety and audited 30 days after admission. Audit results reviewed quarterly during Quality Improvement meetings.
2023-12-07Annual Compliance Visit5 findings
Plain-language summary
On this compliance visit, the Pennsylvania Department of Human Services file includes this account: Staff person A did not receive orientation on fire safety and emergency preparedness topics on their first work day, including evacuation procedures, staff duties during emergencies, designated meeting places, smoking safety procedures.
“Staff person A did not receive orientation on fire safety and emergency preparedness topics on their first work day, including evacuation procedures, staff duties during emergencies, designated meeting places, smoking safety procedures, fire extinguisher location and use, smoke detectors and fire alarms, and emergency services notification.”
The home's plan of correction
Attached completed Orientation paper covering general fire safety and emergency orientation topics. On 12/20/2023, PCHA audited currently employed direct care staff personnel records to validate fire safety orientation was covered on first day of employment. Employees identified as not fully or partially provided orientation will attend next available orientation class. Beginning January 2024, PCHA or designee will audit newly hired direct care staff personnel records weekly x 4 weeks, then bi-weekly x 4 weeks, then monthly x 1 month to validate sustained compliance. Audit findings will be reviewed by quality assurance team.
“Staff person A did not complete required 40-hour orientation training in resident rights, emergency medical plan, mandatory reporting of abuse and neglect under the Older Adult Protective Services Act, and reporting of reportable incidents and conditions.”
The home's plan of correction
Attached completed Orientation paper covering Rights/Abuse topics. On 12/20/2023, PCHA audited currently employed direct care staff personnel records to validate Rights/Abuse 40 hours orientation topics were covered within first 40 hours of employment. Employees identified as not fully or partially provided orientation will attend next available orientation class. Beginning January 2024, PCHA or designee will audit newly hired direct care staff personnel records weekly x 4 weeks, then bi-weekly x 4 weeks, then monthly x 1 month to validate sustained compliance. Audit findings will be reviewed by quality assurance team.
“Direct care staff person B did not receive training in instruction on meeting resident needs as described in preadmission screening form, assessment tool, medical evaluation and support plan during training year 2022.”
The home's plan of correction
Staff Person B received training on 9/23/2023, 11/13/2023, 11/15/2023, 11/16/2023, 11/19/2023, 11/20/2023, 11/21/2023, and 11/22/2023 as outlined in 2600.65f. On 12/20/2023, PCHA audited currently employed direct care staff personnel records to validate training as outlined in 2600.65f for calendar year 2023. Instances identified where training was not provided were addressed with employee education. PCHA scheduled annual training topics as outlined in 2600.65f for calendar year 2024. Beginning January 2024, PCHA or designee will audit 5 actively employed direct care staff personnel records monthly x 3 months to validate sustained compliance.
“Staff person B did not receive annual training in fire safety completed by a fire safety expert or by a staff person trained by a fire safety expert during training year January 2022 to December 2022.”
The home's plan of correction
On 12/21/2023, Campus Executive Director educated PCHA on requirements within 2600.65g. At time of 2024 on-site training, PCHA will record staff attendance and identify staff members not present. PCHA, in conjunction with fire safety expert, will identify subsequent training date for these individuals if needed.
“The home does not have a staff training plan for 2023.”
The home's plan of correction
On 12/18/2023, PCHA drafted comprehensive training plan comprised of regulated annual training topics and held all-staff meetings on 12/20/2023, 12/21/2023 and 12/22/2023 to cover required training topics for calendar year 2023. On 12/15/2023, PCHA scheduled annual training topics as outlined in 2600.66a for calendar year 2024. Beginning January 2024, PCHA or designee will audit 5 actively employed direct care staff personnel records monthly x 3 months to validate sustained compliance. Audit findings will be reviewed by quality assurance team.
Source: Pennsylvania Department of Human Services, Office of Long-Term Living. PA DHS inspection portal →