Messiah Lifeways at Messiah Village: inspection reports
The PA DHS record for Messiah Lifeways at Messiah Village in Mechanicsburg, PA: every visit in the last three years, with each citation in the inspector’s own words. Back to the profile and its summaries.
4 visits, most recent first.
2026-02-04Annual Compliance Visit4 findings
Plain-language summary
On this compliance visit, the Pennsylvania Department of Human Services file includes this account: A resident prescribed specific medications was administered incorrect dosages that did not follow the prescriber's orders.
“Approximately 4 inches of snow and ice accumulated outside the pathway from the dining room exit, creating an obstruction that was not removed.”
The home's plan of correction
On January 30, 2026, the Mechanicsburg area received a significant snowfall due to a winter storm. During the snow removal process across the entire Messiah Lifeways campus, the exit located outside one of the personal care home dining rooms was inadvertently not cleared. Upon discovery of the snow accumulation, the landscaping team was immediately notified. The area was promptly shoveled, and a clear and safe path of egress was established to ensure accessibility in the event of an emergency. During all future snow events, the grounds team will ensure that all exterior exits and walkways throughout the campus are cleared of snow, ice, and any other obstructions to maintain safe and accessible egress. The Grounds Supervisor or the Personal Care Home Administrator (PCHA) will conduct an audit within 24 hours of the start of each snow event to verify that all exits and walkways have been properly cleared. In addition, monthly environmental audits will continue to be conducted to ensure all exits remain free from obstruction. These audits will occur during routine monthly rounds held on the third Tuesday of each month.
“The egress from the dining room could not fully open due to snow and ice blocking the doorway, and the egress at Stairwell 11G was unable to open due to snow, ice, or another object impeding the door from opening.”
The home's plan of correction
On January 30, 2026, the Mechanicsburg area received a significant amount of snowfall due to a winter storm. During the storm, precipitation accumulated and became trapped within the seal of Door 11, which is designated as an emergency exit door for the Personal Care Home at Messiah Lifeways. As a result of the accumulation and freezing conditions, the door did not open easily when tested. On February 4, 2026, at approximately 9:45 a.m., during a partial survey conducted by DHS, the door was found to be difficult to open. Immediately upon identification of the concern, the maintenance team evaluated Door 11. The door was able to be opened with additional force and was determined to have been frozen shut due to weather related conditions. The door seal and surrounding area were assessed, and the obstruction was addressed. Since that time, the door has been functioning properly and opens without difficulty. Following any future snow event, all doors designated and labeled as emergency exits will be tested for proper functionality as part of the post storm audit conducted by the Grounds Supervisor or the Personal Care Home Administrator (PCHA). This will ensure that doors open easily and are not impacted by snow, ice, or freezing conditions. In addition, all exit doors will be tested monthly as part of the ongoing environmental audit process to verify continued proper operation and to identify and address any potential concerns related to door functionality.
“A resident was administered medications prescribed to and belonging to another resident during medication administration on the secure dementia unit.”
The home's plan of correction
This incident occurred on the secure dementia unit. The resident who received the incorrect medication was experiencing multiple behavioral episodes and required frequent redirection and support to reduce anxiety. During medication administration, the nurse was interrupted several times by both residents and staff. While responding to the immediate behavioral needs of the resident, the nurse inadvertently administered medications that had been prepared for another resident. The interruption and shift in focus during the medication pass contributed to human error, resulting in the medications being given to the wrong resident. Contributing factors included environmental distractions, interruption during medication preparation and administration, and the high behavioral acuity on the unit at the time of the incident. The nurse who administered the incorrect medication immediately notified upper management upon recognizing the error. The resident's physician and Power of Attorney (POA) were promptly notified. Per physician direction, the resident's morning medications were held. Vital signs were monitored every hour for six hours, followed by every eight hours for the next 24 hours. Staff were instructed to closely observe the resident for signs of lethargy or any other adverse effects for a full 24 hour period. Staff were further directed that if any new or concerning symptoms developed, they were to contact the primary care provider immediately or call 911, depending on the severity of the symptoms. The facility reported the medication error to the Department of Human Services within the required 24 hour reporting timeframe. In addition, a follow up call was conducted with the POA within 24 hours of the incident to review the resident's status and address any ongoing questions or concerns. The nurse involved in the medication error received immediate education from the Director of Nursing (DON) on the five rights of medication administration and strategies to manage interruptions during medication passes. The nurse who reported the error was also verbally counseled regarding proper medication administration, adherence to the five rights, and techniques for handling interruptions. In addition, all nursing staff who perform medication administration will receive re education on the five rights, proper resident identification, and strategies for managing interruptions during medication passes. Direct care staff will be educated on the importance of not interrupting Licensed Practical Nurses (LPNs) or Medication Technicians (MTs) during medication passes for non urgent requests. The nurse was further instructed on proper handling and storage of medications in the medication cart while addressing immediate resident needs, to prevent any future mix ups. Medication audits will be conducted for a period of one year to ensure that distractions are minimized and managed appropriately during all medication passes.
“A resident prescribed specific medications was administered incorrect dosages that did not follow the prescriber's orders.”
The home's plan of correction
This incident occurred on the secure dementia unit. The resident who received the incorrect medication was experiencing multiple behavioral episodes and required frequent redirection and support to reduce anxiety. During medication administration, the nurse was interrupted several times by both residents and staff. While responding to the immediate behavioral needs of the resident, the nurse inadvertently administered medications that had been prepared for another resident. The interruption and shift in focus during the medication pass contributed to human error, resulting in the medications being given to the wrong resident. Contributing factors included environmental distractions, interruption during medication preparation and administration, and the high behavioral acuity on the unit at the time of the incident. The nurse who administered the incorrect medication immediately notified upper management upon recognizing the error. The resident's physician and Power of Attorney (POA) were promptly notified. Per physician direction, the resident's morning medications were held. Vital signs were monitored every hour for six hours, followed by every eight hours for the next 24 hours. Staff were instructed to closely observe the resident for signs of lethargy or any other adverse effects for a full 24-hour period. Staff were further directed that if any new or concerning symptoms developed, they were to contact the primary care provider immediately or call 911, depending on the severity of the symptoms. The facility reported the medication error to the Department of Human Services within the required 24-hour reporting timeframe. In addition, a follow-up call was conducted with the POA within 24 hours of the incident to review the resident's status and address any ongoing questions or concerns.
2025-01-28Annual Compliance Visit1 finding
Plain-language summary
On this compliance visit, the Pennsylvania Department of Human Services file includes this account: Staff person threw a resident's leg brace at the resident, hitting the resident in the chest. The staff member became frustrated during personal care assistance.
“Staff person threw a resident's leg brace at the resident, hitting the resident in the chest. The staff member became frustrated during personal care assistance. The incident was substantiated as abuse.”
The home's plan of correction
Staff Person A was immediately suspended and subsequently terminated as a contracted agency staff member. The facility notified the contracting agency and performed investigation interviews with the resident and involved staff. Resident's POA was notified. All direct care staff will receive additional abuse and neglect education by March 4, 2025. Random resident interviews will be held on the second Tuesday of each month throughout 2025 in the Enhanced Living (Personal Care) unit to assess resident safety concerns, with findings reported to the Administrator for investigation.
2024-11-05Annual Compliance Visit3 findings
Plain-language summary
On this compliance visit, the Pennsylvania Department of Human Services file includes this account: A resident's support plan did not document that the resident utilizes bedrails, failing to record necessary medical equipment information in the support plan.
“A resident's bed had half bed rails on both sides with openings measuring 11 inches by 15 inches, creating an entrapment risk.”
The home's plan of correction
The enabler bar was removed from the resident's bed on November 11, 2024 by the resident's family and reviewed by the Clinical Manager on November 12, 2024. The POA and the resident were educated on the safety and alternatives of an enabler bar on November 7, 2024 by The Clinical Manager. The resident was evaluated by their PCP and an order was given for an enabler bar to be used on November 19, 2024. Physical Therapy performed an evaluation on November 25, 2024 and ensured the resident was safe to use the enabler bar that was installed on November 25, 2024 by the resident's family with the review of the Clinical Manager. The new enabler bar was audited and approved by the Personal Care Home Administrator ensuring that it meets the requirements of the Department of Health's and the Department of Human Services regulations on November 26, 2024. The Social Worker for the resident updated their RASP to reflect the order from the PCP in regards to the use of the enabler bar on November 25, 2024. An audit was conducted by the Personal Care Home Administrator of all of Messiah's Personal Care Home residents to determine if a resident had any bed rails or not in their room by November 20, 2024. The residents that were identified as having enabler bars, were audited again to ensure they had a proper physician evaluation by the physical therapist and their primary care physician. The bed rails were audited to ensure that they met the standards and regulations per the Department of Health. In addition, residents were educated on other options and the possible dangers of bed rails. No other concerns were found at this time. During the next Resident's Council meeting on December 27, 2024, an education will be provided by the Personal Care Home Administrator on dangers of enabler bars, other equipment that can be used prior to having enabler bars, and the process that is required in order to use an enabler bar. A guideline was created and is being implemented moving forward to ensure all new residents are provided with the guidelines listed above by the Personal Care Administrator effective December 1, 2024. An audit by the Personal Care Home Administrator will be conducted quarterly, starting March 20, 2025, to ensure that all residents using enabler bars are safe and are following the guidelines put in place by Messiah and the Department of Health in conjunction with the Department of Human Services. In addition to this, direct care staff were educated by the Enhanced Living Educator on December 5, 2024 to notify the Clinical Managers of any new bed rails they see while providing care to ensure that residents are not using enabler bars without following proper guidelines.
“A second floor door leading from the Nittany neighborhood to the secured Laurel neighborhood was locked with a disabled keypad that could not be accessed by residents, visitors, or staff, obstructing egress.”
The home's plan of correction
To maintain resident safety, the decision was made to secure the doors so that they no longer could be used to pass through them to get from neighborhood to neighborhood. The doors were not able to be used as an exit unless in the case of an emergency. At the time of an emergency the lock system would disengage and the doors would open for egress. Messiah has developed a plan to ensure that the neighborhood is secure and the door can be used as an exit/passage via a code. In order to execute this plan, the doors in concern will no longer be the end of the secure area. A new door will be reconfigured to be a secured door that can be used with a code to pass through. On November 12, 2024 and November 21, 2024 two quotes were obtained from contracted vendors to relocate the security equipment to meet the requirements for the plan. This project will be completed by January of 2025 by Ronco Technology Solutions. Once this project is complete the doors in concern will no longer be locked. A monthly audit will be done by the Personal Care Home Administrator of all secure doors to ensure they are functioning properly starting December 2, 2024 and will occur on the first Monday of each month. An Education was provided to all Enhanced Living employees on December 5, 2024 by the Enhanced Living Staff Educator. If a concern arises at any time, an emergent plan will be put in place to ensure the safety of the residents.
“A resident's support plan did not document that the resident utilizes bedrails, failing to record necessary medical equipment information in the support plan.”
The home's plan of correction
The enabler bar was removed from the resident's bed on November 11, 2024 by the resident's family and reviewed by the Clinical Manager on November 12, 2024. The POA and the resident were educated on the safety and alternatives of an enabler bar on November 7, 2024 by The Clinical Manager. The resident was evaluated by their PCP and an order was given for an enabler bar to be used on November 19, 2024. Physical Therapy performed an evaluation on November 25, 2024 and ensured the resident was safe to use the enabler bar that was installed on November 25, 2024 by the resident's family with the review of the Clinical Manager. The new enabler bar was audited and approved by the Personal Care Home Administrator ensuring that it meets the requirements of the Department of Health's and the Department of Human Services regulations on November 26, 2024. The Social Worker for the resident updated their RASP to reflect the order from the PCP in regards to the use of the enabler bar on November 25, 2024. An audit was conducted by the Personal Care Home Administrator of all of Messiah's Personal Care Home residents to determine if a resident had any bed rails or not in their room by November 20, 2024. The residents that were identified as having enabler bars, were audited again to ensure they had a proper physician evaluation by the physical therapist and their primary care physician. The bed rails were audited to ensure that they met the standards and regulations per the Department of Health. In addition, residents were educated on other options and the possible dangers of bed rails. No other concerns were found at this time. During the next Resident's Council meeting on December 27, 2024, an education will be provided by the Personal Care Home Administrator on dangers of enabler bars, other equipment that can be used prior to having enabler bars, and the process that is required in order to use an enabler bar. A guideline was created and is being implemented moving forward to ensure all new residents are provided with the guidelines listed above by the Personal Care Administrator effective December 1, 2024. An audit by the Personal Care Home Administrator will be conducted quarterly, starting March 20, 2025, to ensure that all residents using enabler bars are safe and are following the guidelines put in place by Messiah and the Department of Health in conjunction with the Department of Human Services. In addition to this, direct care staff were educated by the Enhanced Living Educator on December 5, 2024 to notify the Clinical Managers of any new bed rails they see while providing care to ensure that residents are not using enabler bars without following proper guidelines.
2024-01-23Annual Compliance Visit6 findings
Plain-language summary
On this compliance visit, the Pennsylvania Department of Human Services file includes this account: A dietary staff person did not receive required annual training during 2022-2023 in fire safety, emergency preparedness, resident rights, the Older Adult Protective Services Act, and falls/accident prevention.
“Documentation regarding medical evaluation requirements for residents was referenced but the specific violation details were cut off in the provided text.”
“The courtyard walkway and the bottom of the large white gate at the courtyard exit were covered with approximately 2 inches of snow, creating an obstruction.”
The home's plan of correction
Maintenance was immediately contacted and removed the snow from the courtyard area. Education was created for all maintenance staff and department managers addressing the regulation and expectations for snow/obstruction removal. Department managers will conduct continuous observation and report concerns to the Enhanced Living Administrator and Senior Director of Campus Services. Proposed completion date: 02/09/2024.
“The home commingled resident funds and home funds by placing funds for two residents in a shared bank account owned by the legal entity, which is prohibited.”
The home's plan of correction
Messiah's Financial Team contacted the bank institution on 2/9/2024 to discuss options to prevent commingling of resident funds. Messiah agreed to work with the bank to evaluate a process that meets regulatory requirements. Proposed completion date: 02/09/2024.
“A dietary staff person did not receive required annual training during 2022-2023 in fire safety, emergency preparedness, resident rights, the Older Adult Protective Services Act, and falls/accident prevention.”
The home's plan of correction
During the October 2023 transition of dietary employees from contract to in-house staff, training records from the previous contractor were not provided. All dietary employees are now required to participate in Messiah's 2024 annual training covering all required areas. Training implementation is managed by a trainer and the Dietary Supervisor. Proposed completion date: 02/09/2024.
“Hot water temperature in the bathroom of resident room #192 measured 124.4°F, exceeding the maximum allowable temperature of 120°F.”
The home's plan of correction
The mixing valve to the unit was found to be broken. Water temperature was immediately adjusted to acceptable levels. New thermal disc valve cartridges were ordered for overnight shipment and the mixing valve was rebuilt on 1/28/2024. Weekly audits will be conducted by the Life Safety Manager on one random room per floor and spa areas to ensure compliance. Proposed completion date: 02/09/2024.
“Fire drills during sleeping hours were not conducted at the required 6-month intervals. The last sleeping hours drill was on 9/27/23, with the previous one on 9/28/22, making them a year apart rather than 6 months apart.”
The home's plan of correction
The Life Safety Coordinator created a new 2024 Fire Drill schedule ensuring drills are held during sleeping hours once every 6 months. The schedule was reviewed and approved by the Enhanced Living Administrator on 1/25/2024. Yearly, the Life Safety Coordinator must submit the next year's schedule by the first working day of November for administrator review. Proposed completion date: 02/09/2024.
Source: Pennsylvania Department of Human Services, Office of Long-Term Living. PA DHS inspection portal →